energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  NHPC submits draft DPR for West Seti and Seti River-6 Hydropower Projects to Investment Board

Indian company NHPC Limited has submitted the draft Detailed Project Report (DPR) for the West Seti and Seti River-6 (SR-6) hydropower projects to Office of the Investment Board of Nepal. Baburaj Adhikari, joint secretary of the Board of Investment, informed the government of the submission.

“The company that got the survey permit for the project has submitted the draft DPR. The final DPR will be prepared after the Board of Investment gives the necessary study response (comment) to it,” said Adhikari. Following the finalization of the DPR, the Project Development Agreement (PDA) process will proceed.

An agreement was signed between the Investment Board and NHPC Limited on August 2, 2079, to issue a survey permit for the detailed project study of the 750 MW Paschim Seti and 450 MW SR-6 projects, with the survey permit issued in October 2079. The agreement stipulated that the DPR be prepared and submitted to the office of the Board of Investment within two years of receiving the survey permit.

The 51st meeting of the Board of Investment, held on June 23, 2079, decided to entrust the development and investment blueprint of these two projects to NHPC Limited. Subsequently, the 52nd meeting of the Board of Investment on July 23, 2079, approved the memorandum of understanding for issuing the survey license.

The final DPR will provide comprehensive information on the social, economic, geographical, technical, and environmental aspects of the projects. It will also outline the estimated cost, project timelines, action plans, market assurance, transmission line construction, and financial resource availability.

The West Seti project, with a capacity of 750 MW, is estimated to cost 1.32 billion USD, while the SR-6 project, with a capacity of 450 MW, is estimated to cost 800 million USD.

Following the analysis of the DPR, if the project is deemed feasible, the PDA will be executed. The successful implementation of these projects is expected to significantly enhance Nepal’s energy infrastructure and contribute to the country’s economic growth.

[20 June, 2024 / fiscalnepal.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries