energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Melamchi water supply to be halted from Friday

The water supply will be stopped to minimize possible risk of damage in existing structure by monsoon rain

Melamchi Water Supply Development Board (MWSDB) says it is halting water supply to the Kathmandu Valley from the Melamchi River from Friday.

The board said it took the decision citing the possible risk of damages to the tunnel structures by flood in the Melamchi River. With the onset of monsoon this year, the water level is reported to have increased massively in the river in the past few days.

Ratna Lamicchane, executive director of the MWSDB, said they have to take the step to minimize possible damages in headworks of the water supply project. According to him, slurry might enter the tunnel along with rising water levels in the river.

The project started water supply from Melamchi River after it was inaugurated by the then President Bidya Devi Bhandari in April, 2021. However, this could not last long as the floods triggered by incessant rainfall and subsequent landslides inundated key structures of the project in June of the same year.

Landslides and flooding in the Melamchi River earlier had caused severe damage to the headworks at Ambathan as well as the sedimentation pond and other structures of the project, making it difficult to resume the water supply immediately.

As a lesson learned, the MWSDB since the incident closes the main tunnel gate with the start of monsoon every year. The water supply is resumed only after the monsoon is over.

The MWSDB is supposed to supply 170 million liters of water daily to the valley. The board however claimed that they are supplying around 200 million liters of water on a daily basis now.

ADB providing grant of Rs 2 billion to rebuild structure of Melamchi Project

The Asian Development Bank (ADB) is providing Nepal with grant assistance of over Rs 2 billion (US $19.75 million) to reconstruct the headworks of the Melamchi Water Supply Project.

The ADB has come up with the action at a time when the Melamchi Water Supply Development Board (MWSDB) is preparing to construct new headworks at a new location.

The new headworks are supposed to be located one kilometer uphill from the existing location.

After a flood in the Melamchi River in June 2021 devastated mainly the headworks of the water supply project, the government authority concerned and the ADB have largely been criticized for their ‘poor study’ over the feasibility of the project.

According to the MWSDB, the construction of the new headworks might take four years for completion. The investment of around Rs 3 billion is estimated for the purpose.

[20 June, 2024 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries