energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Authorities decide not to immediately shut down Melamchi water supply despite earlier preparations to do so from today

The Melamchi Water Supply Development Board (MWSDB) has decided not to immediately shut down the main source of the Melamchi Drinking Water Project located in Ambathan, Sindhupalchowk, despite earlier preparations to halt operations from today. This decision comes in response to the inadequate water flow in the Melamchi River starting today, prompting the committee to exercise caution in distributing water to the designated areas.

With the monsoon commencing in Bagmati Province, the government had initially planned to suspend the project to safeguard against monsoon-related disasters. Ratna Lamichhane, executive director of MWSDB, mentioned that while the project was scheduled to halt on June 13, the decision was made to continue water supply until heavier rainfall necessitates a reassessment.

"In Bagmati Province, we had prepared to temporarily suspend the Melamchi project starting today due to the anticipated increase in water flow in the Melamchi River with the onset of the active monsoon, which poses a potential risk to the project," stated Lamichhane. "However, based on the current observations, there hasn't been a significant rise in water level in the river, and the water remains clean. Therefore, the immediate cessation of the project is not warranted at this time, and we will proceed cautiously with water distribution," he added.

Lamichhane noted that advisors and the Asian Development Bank (ADB) had recommended suspending the Melamchi project temporarily to mitigate risks associated with the monsoon. "While we have been preparing to intermittently suspend the Melamchi project, operations have continued so far," he clarified. "We are still evaluating the situation and will decide promptly if the conditions necessitate halting the project to protect water distribution points from increased risks during heavy rainfall."

The MWSDB has devised plans to resume water supply from the Melamchi project only after the monsoon period, ensuring mitigation against potential damages from monsoon-related disasters. The government's strategy involves temporarily halting water supply at the start of the rainy season and resuming it once the monsoon subsides.

According to the Department of Hydrology and Meteorology (DHM), the South Asian monsoon arrived in Nepal on June 13 this year, three days earlier than usual. Monsoon typically withdraws by October 2. At present, it is spread across the entire country except for Karnali and Sudurpaschim provinces, as reported by the DHM.

[21 June, 2024 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries