energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Lead Acid Battery
¡¡LiFePO4 Battery
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Dhalkebar-Inaruwa 400 kV Transmission Line Commences Operation, Enhancing Nepal-India Electricity Trade

The Dhalkebar-Inaruwa section of the Hetauda-Dhalkebar-Inaruwa 400 kV transmission line, currently under construction, has been put into operation. This project aims to strengthen and enhance the reliability of the electricity transmission system within Nepal and expand electricity trade between Nepal and India.

The 154 km 400 kV double circuit transmission line, extending from Dhalkebar in Dhanusha to the Inaruwa Substation in Bhokraha Narsingh Rural Municipality-4, Sunsari, was charged and put into operation on Tuesday at 7:30 pm. Both the Dhalkebar and Inaruwa 400 kV substations are now connected to this transmission line and have been charged.

With the commissioning of the Dhalkebar-Inaruwa section, electricity transmission at 400 kV has started for the first time within Nepal. Previously, electricity was imported and exported through the Dhalkebar-Muzaffarpur (India) international transmission line at 400 kV. Now, domestic electricity is being transmitted through the 400 kV lines.

Kulman Ghising, Managing Director of the Nepal Electricity Authority, stated that the commissioning of the Dhalkebar-Inaruwa section marks a significant achievement in improving the voltage of electricity supply, particularly in the Terai districts of Koshi Province. This development enhances the overall quality and reliability of the country¡¯s transmission system and increases the volume of electricity trade between Nepal and India. The transmission line has the capacity to transmit about 4,000 megawatts of electricity.

Managing Director Ghising also mentioned that, due to the unprepared transmission infrastructure, the current electricity import-export capacity through the Dhalkebar-Muzaffarpur international transmission line is only 800 MW. However, with the new infrastructure, this capacity can now be increased. Electricity supplied to the Inaruwa substation via the Koshi Corridor can be utilized locally, and any excess can be transmitted to Dhalkebar through the Inaruwa transmission line and exported to India.

The construction of the 288 km transmission line from the Hetaunda substation to the Inaruwa substation in Thanabhayang, located in Hetaunda sub-metropolitan city-11, Makwanpur, was divided into two sections. The Hetaunda-Dhalkebar section spans 134 km and the Dhalkebar-Inaruwa section covers 154 km. The Hetaunda-Dhalkebar section is still under construction.

[26 June, 2024 / nepalenergyforum.com ]¡¡¡¡¡¡
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries