energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  NEA tightens screws to recover dues of dedicated feeders; manufacturers expect soft corner from the new government

The debate between Nepal Electricity Authority (NEA) and industrialists on pending bills of dedicated feeder could not reach a conclusion, with both sides sticking to their standpoints.

Once again, the issue has come to the limelight after the NEA stepped up efforts to disconnect electricity supply lines to those industrialists who have been denying paying the outstanding dues. Few days ago, the NEA cut the electricity supply lines of five production plants including Arghakhachi Cement, Reliance Spinning Mills, Gorahi Cement, Jagadamba Synthetic and Hulas Steel.

A total of 61 manufacturing companies are left to pay cumulative dues of Rs 6.60 billion. According to the NEA official, the power utility will cut the electricity lines of remaining 56 companies successively if they do not show intention to pay the amounts on their part.

Citing power outage issues, the NEA, in 2015, enforced the rule to impose additional fees on industries that consume lots of energy through the dedicated feeder and trunk lines during the period of load shedding. The NEA had charged 65 percent as premium charge for the users of dedicated feeders and trunk lines on top of the normal tariff.

Under the dedicated feeder service, a factory that needed high voltage lines was permitted to receive direct electricity from a nearby substation, while those using trunk lines were provided with regular electricity directly through two substations.

Manufacturers, however, have been denying paying the dues on the dedicated feeders and trunk lines. They have blamed the NEA for slapping the premium charge of period even after the load shedding was declared officially over.

Citing to solve the entangled issue, the government on January 9 formed a committee under the leadership of former Supreme Court Justice Girish Chandra Lal with joint secretaries of the Ministry of Energy, Water Resources and Irrigation (MoEWRI) and the Ministry of Industry, Commerce and Supplies (MoICS) as members.

The committee has suggested the state-owned power utility take premium charges of electricity used during the period of February 2016 to April 2018. However, it has recommended charging a special fee based on the consumption amount recorded by the Time of the Day (TOD) meter.

In the latest development, the state-owned power utility on June 23 issued a notice giving the companies a deadline of 15 days to clear their dues. However, the industrialists did not turn up to pay the amounts within the stipulated timeline that ended last Monday.

The NEA has been refusing to implement the recommendation of the government formed committee. After the NEA sent the excel sheet record of the electricity use, the manufacturers have come up with other excuses for not paying the due amounts. According to a manufacturer, they have now started looking at the newly formed government for a soft corner.

Meanwhile, the NEA’s board meeting held on Thursday decided to facilitate the industrialists to clear their outstanding dues on dedicated feeders in 28-month installments. According to the NEA, the flexibility it has adopted will relieve these companies to settle the payments at a time of ongoing business slowdown.

[ 15 July, 2024 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries