energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  The Upper Tamakoshi Hydropower Plant has halted production for 18 hours

The country’s largest Upper Tamakoshi Hydropower Project, which is financed by domestic investment, has halted electricity production for 18 hours. The production was stopped on Sunday morning to clean the debris that had accumulated in the reservoir of the hydropower plant.

The 456 MW capacity hydropower plant started draining the reservoir’s water from 5 a.m. on Sunday to remove the accumulated sand and other debris, a process that will continue until 10 p.m. Due to this, electricity production will be halted for 18 hours, according to Purna Gopal Ranjit, the manager of the power plant.

He mentioned that during this time, the Tamakoshi Hydropower Plant will also clean and maintain the sedimentation pond, tunnel, and power house. Although the reservoir needs to be cleaned twice a year, this time they have started cleaning it a bit earlier. He explained that due to the heavy floods and landslides this year, debris has accumulated in the reservoir, necessitating an earlier cleanup.

A public notice has been issued urging residents in the riverbank areas to remain cautious as the water flow in the Tamakoshi River will fluctuate during the reservoir cleaning process. When releasing water from the dam, the water level in the river can suddenly rise, so locals in the Tamakoshi and Sunkoshi riverbank areas are advised not to go fishing, swimming, bathing, washing clothes, performing cremations, or extracting sand from the river.

On the 5th July, due to flooding, the doors of the Tamakoshi dam were opened to drain the reservoir, which resulted in an 18-hour halt in production. Manager Ranjit of the Tamakoshi Hydropower Plant mentioned that since the electricity production has been stopped according to the planned schedule for reservoir cleaning, there will be no financial loss.

We have produced more electricity than our target,” he said. “There will be no loss as Tamakoshi’s electricity will not be available on the national transmission line for 18 hours.” He mentioned that there is a schedule to clean the reservoir again in the coming month of (September / October) before the winter season begins.

Source: Katipur

[ 12 August, 2024 / nepalenergyforum.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries