energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy
 
  Construction of Rahughat Hydropower Project achieves 80 percent completion

The 40 MW Rahughat Hydropower Project has achieved 80 percent progress in its construction work. The project being constructed by Raghuganga Hydropower Limited (RGHPL), a subsidiary of Nepal Electricity Authority (NEA), is expected to be completed within the upcoming mid-June to mid-July (Ashad).

The construction of the main civil structures of the power house has been completed. The work of connecting electromechanical equipment including turbines and generators is ongoing. There will be two units of 20 MW each for power generation.

The construction of the civil structure of the dam has been completed. The gates and other equipment for the dam have been transported to the project site. Installation is now set to begin, according to the project.

One hundred and thirty meters of the 1050 meters of penstock pipes laid to convey water from the main tunnel to the power house have been installed.

About 30 percent of the construction of the sand thickening pond (dissenter) has been completed. The construction of the headwork, which was stopped due to rain, is set to resume now.

Under the project, the concrete lining of the 6.2 km long tunnel mine is ongoing. So far, one kilometer of the main tunnel has been concrete-lined.

Kulman Ghising, managing director of the NEA and chairman of RGHPL, has monitored the construction site and discussed matters with project management, consultants and construction entrepreneurs.

Ghising instructed them to make a unified schedule to complete the construction by mid-June to mid-July next year at any cost.

The project is estimated to cost Rs 9.17 billion. The project includes a concessional loan of $67 million from the Export-Import Bank of India (Exim Bank), with the remaining amount invested by the government and other authorities. Following Trishuli and Devighat, India has also provided assistance for power generation to Rahughat.

[ 20 September, 2024 / nagariknetwork.com ]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries