energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Kulekhani Dam at Risk of Overflow; Residents Warned of Possible Gate Opening

The Makwanpur administration office has asked the residents of the lower coastal areas to be cautious as the Kulekhani reservoir in Indrasarovar Rural Municipality is about to fill up due to incessant rain.

As Kulekhani Dam is in full condition, there may be an overflow and the dam gates will have to be opened at any time, so the residents of the downstream areas have been requested to be cautious . Residents living in the downstream areas from Kulekhani to Kulekhani are requested to be on high alert and security personnel and volunteers to be on high alert as well.

The reservoir of Kulekhani, which is the “backup” of the Nepal Electricity Authority, has become full due to continuous rain in the catchment area . 1,527.10 centimeters of water has been collected in Kulekhani reservoir till 7 o’clock on Friday. Kulekhani Reservoir Indrasarovar has a capacity of 1,530 meters of water. Now after collecting about 3 meters of water, Indrasarovar will be filled.

‘If water continues to fall in the catchment area as it is now, the Kulekhani reservoir will be filled overnight,’ said Tara Dutt Bhatt, the head of Kulekhani First Hydro Power Project, ‘If the Kulekhani reservoir is full, the dam gates will have to be opened .’ He said the siren would sound when the door was opened. According to the project, electricity was generated until the water level dropped to 1,483,900 centimeters. Kulekhani Reservoir has a water level of 1,483 meters as the last point.

Electricity cannot be generated once the water level drops to 1,483 meters. If the reservoir’s water had not been used almost to its last point, the Kulekhani reservoir would have been full by now,” an engineer from the project said. “This year, the Kulekhani reservoir will fill up.

Daman, Palung, Bajrabarahi, Chitlang of Thaha Municipality located in the northern region of Makwanpur, and Markhu and Fakhel of Indrasarovar Rural Municipality are watershed areas of the reservoir. Heavy rainfall is currently occurring in the watershed area.

[ 27 September, 2024 / nepalenergyforum.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries