energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy
 
  85 percent work completed on Beni-Jomsom-Korala section of Kaligandaki Corridor

Over 85 percent of the work on the Beni-Jomsom-Korala section of the Kaligandaki Corridor has been completed so far under the North-South Trade Route Expansion Project (NSTREP).

Excluding the nine projects added in the current Fiscal Year (FY), the overall physical progress of the section has reached 85 percent, according to the NSTREP.

Bishnu Chapagain, Information Officer of the Beni-Jomsom-Korala Road Project, said that over 85 percent physical progress has been made in upgrading the road and 84 percent progress in the construction of bridges and culverts. He stated that construction of the national pride project, which connects to the northern Korala border transit point, began in the FY 2016/17.

According to Chapagain, seven big and small roads have been blacktopped while six roads have been graveled under the road expansion project. He said blacktopping and upgrading have been completed in seven phases, including the Beni-Kalipul, Beni-Galeshwor, Tatopani-Kaiku, Kaiku-Kowang, and Jomsom-Kagbeni sections of Myagdi.

Chapagain added that the work on the Jomsom-Korala section has been completed in six phases, and graveling work on 25 kilometers of the Charang-Chhoser section is in its final stage.

According to him, a contract was signed for blacktopping a 105-km road, of which 75 km has been completed. Similarly, out of the 110-km Jomsom-Korala section, graveling has been completed on 90 km, according to the Project Office.

Of the 19 bridges planned under the Project, 14 have been completed, while the remaining five are under construction, said Chapagain.

Of the 14 completed bridges, nine were constructed in the Mustang section and five in the Myagdi section.

[ 19 March, 2025 / nagariknetwork.com ]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries