energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy
 
  Loan agreement signed for 8MW Tadi hydropower

ABP Energy Pvt. Ltd. and Siddhartha Bank Limited have signed an agreement for credit facilities for the construction of the 8 MW Tadi Ghyangphedi Hydropower Project.

Chairman of ABP Energy Private Limited Purna Lal Shrestha and Credit Head of Siddhartha Bank Amit Shrestha signed the agreement regarding credit facilities at a programme organised in Kathmandu on Wednesday.

The total estimated cost of the project is Rs. 1.64 billion. Chairman Shrestha said that an agreement has been reached with Siddhartha Bank to manage Rs. 1.23 billion, which is 75 per cent of the total cost, through long-term loans.

The remaining 25 per cent will be managed from equity, he said.

The project is being developed by a group of experienced promoters. The company's directors include Balaram Khatiwada, general secretary of Independent Power Producers Association, Nepal (IPPAN) and Asgar Ali, information technology expert.

The Tadi Ghyangphedi Hydropower Project, located in Dupcheshwor Rural Municipality, Nuwakot, is targeted to complete within 18 months.

The required commercial production date (RCOD) of the project has been set as May 14, 2027.

Khatiwada, general secretary of IPPAN and project director, said that the project also aims to generate income from hydro tourism once it comes into operation.

He said that as the project will be built on the trekking route to Gosainkunda, the camp house built by the project can be converted into a homestay and hospitality facility can be provided to tourists.

The production license for this project was received from the Department of Electricity Development (DOED) on July 15, 2024. The Power Purchase Agreement (PPA) was concluded on September 13, 2024.

The project, which has a 3900-metre pipeline, has a head of 446 metres.

The design discharge is 2.2 cusecs. The project, which will generate 48.7 million units of electricity annually, is projected to generate an annual income of Rs. 290 million.

The project will generate 15.97 Gigawatt hours of energy in the dry season and 32.77 Gigawatt hours in the rainy season, said the company.

[ 20 March, 2025 / risingnepaldaily.com ]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries