energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy
 
  Dhalkebar-Bara transmission line construction completed

The construction of the Dhalkebar-Bara section under the Hetauda-Dhalkebar-Inaruwa 400 kV transmission line project has been completed.

The Hetauda-Dhalkebar-Inaruwa transmission line is under construction to strengthen and make reliable the electricity transmission system within the country and to expand the electricity trade between Nepal and India.

The 100-km transmission line from Dhalkebar substation in Dhanusha to Saraswati Danda on the border of Bara and Makawanpur through Mahottari, Sarlahi and Rautahat in the west has been completed.

The 154-km 400 kV double-circuit transmission line from Dhalkebar of Dhanusha to Inaruwa Substation at Bhokraha Narsingh Rural Municipality-4 in Sunsari has been completed and has come into operation since last June.

A circuit of the around 60-km 400 kV transmission line from Dhalkebar to the forest near Chandranigahapur (Chapur) Bazaar of Rautahat has been brought into operation at 132 kV to further ease the flow of electricity from Dhalkebar to the west.

The 400 kV transmission line was charged to 132 kV through 'tapping' at the site in the presence of Nepal Electricity Authority (NEA) Managing Director Kulman Ghising on Thursday.

NEA Managing Director Ghising said the 400 kV transmission line that has been completed has been charged at 132 kV to remove the obstacles in the existing infrastructure to supply electricity from Dhalkebar to the west and vice-versa.

"Additional electricity can be imported from India during the day from the Dhalkebar-Muzaffarpur inter-country transmission line to address the current energy shortage seen in winter.

It will allow water from semi-reservoir projects like Kulekhani Reservoir, Upper Tamakoshi, Kaligandaki, Marsyangdi and Madhya Marsyangdi to be stored in the afternoon and used at night for power generation.

This will make it easier to manage the power supply from Dhalkebar to the west," Ghising said.

[ 22 March, 2025 / nagariknetwork.com ]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries