energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Nagdhunga Tunnel Construction Stalled for 22 Days Due to Local Obstructions

The work on the Nagdhunga-Sisnekhola tunnel has been halted for 22 days as of Monday. There is still uncertainty about when construction will resume. The halt in construction is due to local protests. Neither the government has made any efforts to start the work, nor have the locals facilitated it.

Just as Nepal’s first road tunnel was nearing its final phase before coming into operation, the halt in work has been met with indifference from the Ministry of Physical Infrastructure and Transport and local authorities. While there have been some efforts to complete basic formalities, no one has taken steps toward a long-term solution, preventing progress on the country’s first road tunnel project.

The locals have obstructed the work by repeating demands that the project has mostly already fulfilled. The project stated that the construction timeline has been delayed due to these obstructions, even though the work was in its final phase. Claiming that previously fulfilled demands still need to be properly addressed, the locals have not allowed work to proceed since March 16. Currently, construction has come to a halt on both the Kathmandu and Dhading sides. Sanjay Panthi, Senior Divisional Engineer of the Nagdhunga Tunnel Construction Project, said the issue has worsened because locals have not attended repeated calls for dialogue.

“We have sent letters requesting them to come for talks, but they haven’t shown up. We are actively trying to resolve the issue through dialogue,” he said. “Discussions are ongoing within the Department of Roads regarding how to move the construction forward.” According to him, although the project is forwarding the demands to the concerned authorities for fulfillment, the locals have not allowed the construction work to continue. It’s been nearly a month since the locals started obstructing the work, but no solution has been reached yet.

Despite repeated obstructions by locals, the ministry has not taken any initiative for an immediate solution. Even in previous instances when work was halted for a month, the concerned authorities remained indifferent. If the construction company demands compensation for the halted period, the government could face the risk of paying around 5 million rupees per day. Ward member Laram Subedi of Ward No. 2 in Chandragiri Municipality claims that the locals halted the work after the project failed to fulfill the demands it had previously agreed to address.

“This situation arose because the problems in the ward were not addressed,” he said. “We have sent letters to inform the concerned authorities about the locals’ demands, but the issues raised since the beginning of the project have not been fulfilled, even as construction nears completion.” He added that frequent changes in ministers have contributed to the problem, as they are often not well-informed about local demands.

The project has currently managed the water supply after the natural sources dried up, but he expressed concern about future costs, saying, “In the future, fees will have to be paid for the water, and not everyone will be able to afford it.” He emphasized, “If the government had taken the locals’ demands seriously and made decisions accordingly, there wouldn’t have been any problem.”

Frequent changes in project chiefs have also made it difficult to resolve immediate issues within the project. Currently, the project is without a chief. After Project Chief Gyanendra Kumar Jha was transferred to the Suryabinayak–Dhulikhel Road Project, the Nagdhunga Tunnel Construction Project has been left without a leader.

Work was underway with the goal of bringing the tunnel into operation by September–October 2025. However, problems escalated after locals disrupted the construction midway. Currently, work inside the tunnel—such as lighting, ventilation, and concrete road construction—is in its final stage.

The flyover at Kisipidi in Balambu, which is also in its final phase, has come to a halt. Locals from Tutipakha in Chandragiri–2 have demanded that the ongoing programs or projects carried out through the main project be continued either by the same project or through the Department of Roads.

This is not the first time that locals have obstructed the construction of the tunnel. Since the beginning of the project, residents from both Dhading and Kathmandu districts have repeatedly disrupted the work. Locals have raised demands such as ensuring free drinking water even after the project is completed, providing fair compensation for damaged houses, and guaranteeing employment for people from the affected areas based on their qualifications and capabilities. It is in pursuit of these demands that they have been obstructing the construction.

The physical progress of the tunnel, which began on October 20, 2019, has reached 87%. The emergency tunnel is 2,557 meters long, while the main tunnel is 2,688 meters long. Currently, more than 10,000 vehicles travel daily through the Nagdhunga road section. The Japanese company, Hazama Ando Corporation, is carrying out the construction of the tunnel. The total contract value of the project is 22 billion rupees, which includes a concessional loan of 16.5 billion rupees from Japan and an investment of 6 billion rupees from the Nepalese government.

Source: Kantipur

[ 6 April, 2025 / nepalenergyforum.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries