energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Second Pakistani Hualong One Unit Passes Final Acceptance

The final acceptance ceremony

On April 18, a ceremony at the Karachi nuclear power plant in Pakistan’s Sindh province marked the final official acceptance of Unit 3. Built by the China National Nuclear Corporation (CNNC), this unit is the second Hualong One reactor supplied by China at the site. Representatives from China and Pakistan signed the final acceptance certificate during the event.

Karachi Units 2 and 3 are the first exports of CNNC’s 1,100 MWe Hualong One pressurized water reactor, marketed internationally as the HPR1000. Construction of Unit 2 started in 2015, followed by Unit 3 in 2016. Unit 2 reached first criticality in February 2021 and was connected to the grid in March 2021 after completing commissioning tests. Its final acceptance was formalized in May 2024. Unit 3 achieved first criticality in February 2022, was grid-connected in March 2022, and passed preliminary acceptance tests on April 18, 2022, entering commercial operation.

CNNC stated: “The acceptance of both units verifies the technical maturity and international market adaptability of China’s independent third-generation nuclear power technology Hualong One.” The company highlighted the project’s role in providing clean energy solutions for countries involved in global infrastructure initiatives.

The two Hualong One units at Karachi have generated over 48 billion kWh of electricity, significantly addressing Pakistan’s energy needs. CNNC noted: “This generation has reduced standard coal consumption by 14.976 million tonnes and cut carbon dioxide emissions by 39.168 million tonnes annually.” These units support Pakistan’s efforts to optimize its energy mix, promote low-carbon development, and achieve sustainable growth.

The Karachi site, also known as KANUPP, previously hosted Pakistan’s first nuclear reactor, Karachi 1, a 100 MWe Canadian pressurized heavy water reactor, which operated for 50 years until its shutdown in 2021.

In August 2023, Pakistan’s Executive Committee of the National Economic Council approved the construction of Chashma Unit 5, another Hualong One reactor, at Mianwali in Punjab. This site already houses four operating Chinese-supplied CNP-300 reactors. Construction of Chashma 5 began with the first concrete pour in December 2024.

The successful completion of Karachi Units 2 and 3 underscores the reliability and global potential of the Hualong One technology, contributing to Pakistan’s energy security and environmental goals.

by world nuclear news

[ 23 April, 2025 / world-energy.org ]   
 

4th Nepal Electric, Power & Lights International Expo

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries