energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Budhiganga Hydropower Project Faces Contract Delays

It has been nearly three decades since the study began for the 20-megawatt Budhiganga Hydropower Project, which was proposed to be constructed in Safebagar Municipality–10 of Achham.

However, the construction process of the project has not been able to move forward till now. Although the government initiated the tender process three times, it was canceled on all three occasions. Even though a fourth tender was called, it has not been finalized yet.

According to the project, there were different reasons for the cancellation of the tender each time. The first time, it was due to a lack of competition; the second time, due to excessively high cost proposals; and the third time, because of the disapproval from the Saudi Fund (the main lender). Currently, the fourth tender process is underway, but the agreement has not been finalized yet due to the lack of consent from the lender.

The study for this project, which the government had proposed to construct on its own, began as early as 1995. According to the feasibility study and the environmental impact assessment, the project’s estimated cost is around NPR 10 billion. After completing the engineering design and environmental impact assessment, a loan agreement of NPR 6 billion was signed with the Saudi Fund for Development on June 18, 2014, for the construction of the project.

The duration of that agreement was until 2023. However, since construction did not progress within that period, the loan agreement has been extended until 2027. Similarly, another loan agreement worth NPR 1.8 billion was signed with the Kuwait Fund for Arab Economic Development on July 4, 2012, for the project. The remaining cost will be covered by the Government of Nepal.

To prepare the Detailed Project Report (DPR), an agreement was signed on June 29, 2015 with the Australian company SMEC International and Uday Consultancy. However, the DPR was only completed five years later, in 2020. According to the project, the preparation of the DPR cost around NPR 199.1 million.

The first tender process for the project began in August–September 2021. At that time, only one bid was submitted, so the process was canceled citing lack of competition. Since low competition in an international-level tender raises concerns about transparency and price competitiveness, the process was annulled. According to the regulations, at least three bidders must participate in such a tender for it to be considered valid.

According to the project, the second tender was called in March–April 2022. However, all construction companies quoted prices significantly higher than the estimated cost, leading to the cancellation of the tender. In the third round, held in September–October 2022, although a company submitted a bid at an appropriate price, the lender, the Saudi Fund, rejected it, stating that it did not meet their standards. The agreement was halted after the Saudi Fund expressed that the proposed contractor’s financial and technical aspects were inadequate.

In the fourth round, the notice for the project tender has already been issued and the evaluation process completed. However, the agreement has not yet been finalized, according to Surendra Ghimire, the head of the Budhiganga Hydropower Project. He stated that prior approval from the donor is required before signing the contract. Although all the necessary documents have already been sent, consent has not been received so far.

According to him, the main contract process for the project is still not finalized. Although tenders have been called for civil and hydromechanical works, the agreement has not been signed yet. “In the current fiscal year, there is a budget of NPR 2.196 billion for civil and hydromechanical works, and NPR 310 million for electromechanical works. But the agreement has not been reached,” said project chief Ghimire. “The construction process has been affected because the government has not been able to ensure the necessary budget.”

He also mentioned that since the project cost will now exceed the previously agreed amount, there are discussions underway about not requesting additional support from the lender and instead having the Government of Nepal manage the additional cost on its own.

So far, 320 ropanis of land have been acquired for the project. Land acquisition has been completed in three districts - Achham, Bajura, and Doti - for purposes including the powerhouse, substation, office buildings, and dam site. According to the project, 250 ropanis of land have been acquired in Achham, 50 in Doti, and 20 in Bajura. The process of land acquisition for transmission line towers has also begun, and the construction of a bridge has been completed.

Source: Kantipur

[ 31 July, 2025 / nepalenergyforum.com ]   
 

4th Nepal Electric, Power & Lights International Expo

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries