energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  102 MW Middle Bhotekoshi Hydropower set to connect to National Grid

The 102-megawatt Middle Bhotekoshi Hydropower Project, constructed in Sindhupalchok, is now ready for commercial power generation and will soon be connected to Nepal’s national transmission grid.

The project has been developed under the leadership of Chilime Hydropower Company, a subsidiary of the Nepal Electricity Authority (NEA), using domestic investment and expertise. Although construction was completed several months ago, power generation had been on hold due to delays in completing the transmission line.

The electricity generated will be transmitted through the New Khimti 400 kV substation and connected to the national grid via the Dhalkebar transmission line.

NEA Managing Director Hitendra Dev Shakya visited the project site on Friday to inspect the final preparations. During the inspection, he instructed officials to ensure the power plant is protected from potential flooding and to remain on standby. He also called for a leakage test of the 7.2 km tunnel and stressed building sliding barricades to protect the powerhouse and other infrastructure from possible floods.

The project faced multiple setbacks including the Jure landslide in July 2014, the devastating April 2015 earthquake, a 5.5-month border blockade at the Nepal-India border starting October 2015, floods in the Bhotekoshi River in June 2016 and again in 2020 and the COVID-19 pandemic.

Construction delays were largely attributed to natural disasters and underperformance by the civil and hydromechanical contractor, Guangxi Hydroelectric Construction Company of China. The electromechanical works were handled by Andritz Hydro.

Initially, the estimated cost of the project during the loan agreement with the Employees Provident Fund was Rs 12.28 billion (excluding interest during construction). The revised estimated cost now stands at Rs 15.03 billion.

The company has already issued public shares and has over 1,075,000 ordinary investors.

The project is expected to generate 542.2 million units (kWh) of electricity annually. The NEA will purchase this electricity at a rate of Rs 8.40 per unit during the dry season and Rs 4.80 during the wet season, leading to an estimated annual revenue of Rs 2.8 billion for the company.

[ 1 August, 2025 / nagariknetwork.com ]   
 

4th Nepal Electric, Power & Lights International Expo

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries