energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Relief for Three Trillion in Private Electricity Investments: Survey Permits Extendable to 7 Years

The government has addressed the long-standing demand raised by private hydropower promoters through the amendment of the Electricity Act.

Through the ‘Some Nepal Act Amendment,’ according to the amendment made to the Electricity Act, 2049 (1992), the permission period for electricity project surveys can now be extended up to a maximum of 7 years under special circumstances.

Private sector promoters, including the Independent Power Producers’ Association, Nepal (IPPAN), have repeatedly demanded an extension of the survey permit period. However, although IPPAN lobbied for an extension of the validity period for all types of permits related to electricity projects, the government has, for now, only arranged to extend the period for survey permits.

This amendment has provided relief to about three dozen projects that were located inside protected areas and were unable to proceed with surveys due to floods and landslides. According to IPPAN, this amendment has facilitated projects totaling around one thousand megawatts. As a result, approximately 300 billion rupees worth of investment from the private sector has been relieved.

The government has made the initial phase activities of electricity projects more flexible by amending the Electricity Act, 2049 (1992). From now on, the validity period of the permit issued for project surveys can be extended up to a maximum of 7 years under special circumstances.

“Previously, the law provided that the survey license period would be initially granted for one year, and then it could be extended for a maximum of 5 years. Now, after the amendment, the total duration can be maintained for up to a maximum of 7 years.”

According to the amended act, it is clearly stated in Section 5 of the Electricity Act, 2049, that “disasters, general strikes, curfews, or other such extraordinary situations beyond control” which hinder the timely completion of survey work shall be considered special circumstances. In such cases, upon confirmation from the relevant government authority, the survey license period can be extended by up to an additional two years.

According to this provision, projects that have already obtained a license and used the maximum period of five years will also receive an additional two years if they have experienced special circumstances.

According to the Ministry of Energy, this provision has been made in response to the demands of private and government promoters involved in electricity production. Recently, problems such as the inability to complete survey work on time have arisen due to the COVID-19 pandemic, prolonged strikes, local obstructions, legal procedures, geographical difficulties, and disasters.

Keeping this in mind, the government has adopted a policy to introduce flexibility through the amendment of the Electricity Act. According to the Ministry of Energy, Water Resources, and Irrigation, this has been done to provide project promoters with a clear timeline and assurance of security.

Recently, the government has adopted a policy to attract investment in the energy sector and to facilitate transmission and production projects. The amendment of the Electricity Act is also part of that strategy.

Ganesh Karki, the president of IPPAN, stated that this provision will make things easier, especially since the survey license period has expired due to the inability to work on projects located in forest areas.

“We had also requested an extension of time for other permits, and adding time for surveys is also a positive step,” said President Karki. He further stated that this will make things easier for many investors as well.

Now, if there is a delay in the survey work of any project due to external reasons, promoters can apply for an extension of the permit period. The concerned authority can collect evidence and make the necessary decision.

Source: Biznessnews

[ 4 August, 2025 / nepalenergyforum.com ]   
 

4th Nepal Electric, Power & Lights International Expo

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries