energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Flood causes damage worth millions to Super Nyadi Hydro project

The flood in Nyadi River has damaged the under-construction 40.27 MW Super Nyadi Hydropower Project.

The flood in the Nyadi River flowing through Ward Nos. 6 and 7 of Marsyangdi Rural Municipality in Lamjung has caused damage worth millions of rupees to the under-construction 40.27 MW Super Nyadi Hydropower Project.

The flood with the heavy rains throughout the day on Sunday, has destroyed the project's structures and washed away machinery, tools and construction materials.

The flood damage to the project, which has completed about 77 per cent of its construction, will delay production.

According to Project Manager Bimal Dhakal, the flood has caused damage worth about Rs. 800 million.

The flood has damaged the headbox, powerhouse, access road, crusher industry, among others.

In the area of headbox, four mixtures, excavators, 350 bags of cement, 70 tonnes of iron rods, diesel generators, compressor machines and crushers have been completely damaged by the flood.

Similarly, landslides have damaged 15 places on the 20-kilometre access road to the headbox, while a large landslide has occurred in the penstock pipe and vertical penstock area, said Dhakal.

According to him, the flood has washed away 700 bags of cement and 150 tonnes of iron rods stored in the powerhouse area, while the access road has been completely damaged.

Three tamarack machines, three diesel generators, two compressor machines and three store buildings have been completely damaged by the floods in the powerhouse area.

Dhakal said that the flood has washed away two Bolero jeeps, one excavator and one tipper as well.

The flood has also washed away a bridge constructed for walking.

“We have estimated that the total damage is around Rs. 800 million,” Dhakal said, adding that the construction work of the project has been halted due to the floods and landslides.

The project is being jointly constructed by High Himalaya and Dhaulagiri Construction and Development Pvt. Ltd.

The estimated cost to complete the project is Rs. 7 billion. Six financial institutions, led by NMB Bank, have invested Rs. 5.25 billion (75 per cent) in loans.

Around Rs. 1.75 billion (25 per cent) of the total estimated cost has been managed as equity capital.

The project will generate 235.76 gigawatt hours (235.76 million units) of electricity annually.

The electricity generated by the project will be connected to the 132 kV Tarikuna Khudi substation, 11 kilometres away from the project site.

The company will build the transmission line from the project to the substation itself, said the company.

By Nabin Raj Kuinkel

[ 5 August, 2025 / risingnepaldaily.com ]   
 

4th Nepal Electric, Power & Lights International Expo

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries