energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  371 drinking water projects remain incomplete in Madhes Province

The drinking water project in Bishrampur, Mithila Municipality-5, Dhanusha, which began 10 years ago, still remains incomplete. The Drinking Water and Sanitation Division Office, Dhanusha, started working on the project in 2015, aiming to provide clean drinking water to residents within five years.

Locals reported that work on the drinking water project to supply clean water to 618 households in Bishrampur has been halted. The project included the construction of overhead tanks, electricity connections, staff buildings, and fencing of the office premises. However, the deep boring and pipeline expansion work still remains unfinished.

Following the water crisis in the village, the Drinking Water and Sanitation Division Office, Jaleshwor, had begun preparations to operate the drinking water project through an alternative method. Similarly, the project that started 12 years ago in Kemalipur, Mithila Municipality, also remains incomplete.

These are not the only drinking water projects facing delays. The Sabaila Drinking Water Project in Dhanusha, initiated in fiscal year 2015/16; the Pashupatinagar Drinking Water Project in Mahottari, started in fiscal year 2014/15; the Dhangadha Drinking Water Project in Basbariya Rural Municipality, Sarlahi, launched in fiscal year 2016/17; and the Bateshwor Drinking Water Project in Dhanusha are all currently stalled.

In recent years, groundwater levels have fallen, leading to a water shortage in Madhes Province. As wells and taps dried up, water is now being distributed in some areas by tankers. However, the incomplete and neglected water projects that could easily supply water are still not operational.

According to the Drinking Water and Sanitation Division under the Ministry of Energy, Irrigation, and Drinking Water of Madhes, there are currently 371 incomplete drinking water projects across eight districts. These projects began from fiscal year 1999/2000 to 2017/18. After the provincial government was established, the federal government transferred these projects to Madhes in 2018.

Laxmi Pantha, an engineer at the Drinking Water and Sanitation Division, stated that only 94 of these 371 projects are currently supplying water.The provincial government is building 88 new drinking water projects, with nine already providing water, he added. He explained, “The completion of the drinking water projects transferred by the federal government has been delayed due to a lack of funds. Since they are conditional grant schemes, the provincial government is not permitted to invest in them.”

For this fiscal year 2025/26, the federal government has allocated Rs. 160 million in conditional grants. It requires Rs. 8 billion to complete the remaining 371 projects.

Pantha noted that, owing to limited budgets and annual conditional grants, completing these projects will take more time. If all projects are finished on schedule, approximately 1.6 million residents of Madhes Province will have access to clean drinking water.

By Vijay Kumar Sah

[ 8 August, 2025 / risingnepaldaily.com ]   
 

4th Nepal Electric, Power & Lights International Expo

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries