energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Upper Marsyangdi-A Generates 3 Billion Units of Power

The 50-megawatt Upper Marsyangdi-A Hydropower Project in Bhulbhule of Marsyangdi Rural Municipality-8, Lamjung, has produced more than three billion units of electricity.

According to the project, it has produced around 3 billion kilowatt-hour (kWh) of electricity by Friday evening and connected it to the national transmission system.

The project, which was built in 2013 with 90 per cent investment from Chinese multinational company Sino Hydropower Company and 10 per cent from Nepali Sagarmatha Power Company, began producing electricity in September 2016.

The commercial production was started on January 1, 2017.

Tong Jiangpo, head of the project’s production technology department, said that around 3 billion kilowatt-hours of electricity has been connected to the national transmission line.

He said that the project has produced 37.3 million kilowatt-hours of electricity, exceeding the annual electricity production expectation of 33.5 million kilowatt-hours.

He said that this project has made a good contribution to Nepal’s energy sector.

The run-of-the-river type project has achieved 107 per cent of the annual production plan by generating 374 million units of electricity in 2024.

Out of this, 372 million units have been supplied to the national grid, achieving 117.1 per cent of the annual contracted production.

The electricity generated by the project is being sent to Kathmandu and Pokhara, among other areas.

This has played an important role in reducing the power shortfall seen especially during the dry season.

Dayaram Dahal, an interpreter of the project, said that the project has shown very strong performance in terms of safety and production in the last eight years.

A power purchase agreement (PPA) of the project was signed with the Nepal Electricity Authority in 2052 BS at a cost of USD 7 cents (Rs. 7) per unit.

The project has been constructed at around Rs. 16 billion.

The project itself built a 20-kilometre-long 125 kV transmission line to connect it to the national transmission line.

The project has been supporting development at the local level. The project has developed a 340-metre-long tunnel for local use, a bridge over the Marsyangdi River, and roads at various locations.

Chairman of Marsyangdi Rural Municipality Arjun Gurung said that the tunnel has not only helped locals for the movement around but has also helped promote tourism.

Source: TRN

[ 12 August, 2025 / nepalenergyforum.com ]   
 

4th Nepal Electric, Power & Lights International Expo

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries