energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  82 MW Solu Khola Hydropower Project Linked to National Grid

The 82 MW Lower Solu Hydropower Project, built in Solukhola in Solukhumbu, which is the hub of large hydropower projects, has been connected to the national transmission line.

The electricity generated from the project is connected to the Lammane substation in Tingla through the 132 kV double-circuit transmission line of the Solu Corridor.

The project, promoted by Solu Hydropower Limited, has been connected to the national transmission line for testing from the third week of July.

A five-kilometre-long tunnel has been constructed to control the flow of the river and create a structure to generate energy.

The recently completed project, which was built on the border of Solududhkunda Municipality-7 and 11, generated electricity by pumping water to an underground power house in Bhadaure, Tingla, about six kilometres away, said Krishna Bahadur Chaudhary, assistant manager of the project.

According to him, two turbines with a capacity of 41 MW each have been installed.

Successful testing of both units on the grid has been completed, he said.

Since the beginning the construction of the hydropower project, which began in 2016, the project has faced geographical difficulties, technical complications and climate-related obstacles.

The construction took longer than scheduled after a landslide caused extensive damage to the structure, including the penstock, when it was in its final stages, he said.

Assistant Project Manager Chaudhary said that all the structures had to be reconstructed.

Although this has increased the cost somewhat, it is expected to benefit long-term sustainability.

This project was built with an investment of Rs. 16 billion from various European banks, including FMO.

Although the construction company had set a target of completing the project by September 2025, the construction work was completed two months in advance and electricity production started.

The project is targeted to generate a minimum of 23 MW in winter and a maximum of 82 MW in the rainy season.

The project is part of the government’s ‘Super Six’ project, which includes six major hydropower projects being built with private investment.

Along with power generation, this project has made a significant contribution to employment, infrastructure, business mobility and economic activities in Solukhumbu district.

Dozens of local youths, both technical and non-technical, have got employment opportunities during the construction of the project.

Local people’s representatives have expressed confidence that this project will become the backbone of Solukhumbu’s prosperity. Along with power generation, it is expected that tourism, industry, services and infrastructure development will gain further momentum.

Source: Rising Nepal

[ 17 August, 2025 / nepalenergyforum.com ]   
 

4th Nepal Electric, Power & Lights International Expo

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries