energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Upper Myagdi-1 Hydropower Project Hits 30% Milestone

- The Upper Myagdi-1 Hydropower Project has achieved 30 percent physical progress.

- The construction of the dam, tunnel, and powerhouse is moving forward at a rapid pace.

- The project is expected to supply an annual average of 315.01 GWh of electricity to the national grid.

The Upper Myagdi-1 Hydropower Project, currently under construction with a capacity of 53.5 megawatts in Dhaulagiri and Malika rural municipalities of Myagdi, has achieved 30 percent physical progress.

The project, promoted by Upper Myagdi Hydropower Limited, has accelerated the construction works of the dam, tunnel, and powerhouse. Project Chief Jyoti Kumar KC informed that within one year, the project has achieved 30.94 percent physical progress and 30.80 percent financial progress.

Tunnel excavation is being carried out from four points. In line with the target of starting electricity generation by February/March 2027, we have accelerated the construction of the powerhouse and dam as well,” he said. Out of the total 5,789.71 meters of tunnel, 2,360 meters have been completed so far.

The dam construction site has achieved 45 percent physical progress. For the project, an agreement was signed with Luna Builders and Contractor on April 1, 2024.

A 15-meter-high and 40-meter-long dam is being constructed at Khamla in Dhaulagiri Rural Municipality-4 to divert the water of the Myagdi River into the tunnel. Three water-settling ponds, each 100 meters long and 15 meters high, are also under construction near the dam site.

A study is underway for a 1.5-kilometer, 132 kV transmission line to connect the powerhouse to the 132 kV substation under construction at Dandakhet in Malika Rural Municipality-7.

The powerhouse of the project, which will be built with an investment of 11.23 billion rupees through loans from six banks led by Sanima Bank, along with shares from the promoting company and the general public, will be located at Bharwang in Malika Rural Municipality-7. The project is expected to supply an annual average of 315.01 GWh of electricity to the national grid.

Kantipur

[ 8 December, 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries