energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Deforestation Surges Ahead of Upper Arun Project Construction

More than two thousand trees have been cut down for the construction of the 1,063-megawatt Upper Arun project, which is set to be built in Bhotkhola Rural Municipality.

The trees were cut from national and community forests in Bhotkhola Rural Municipality-2 and 4. Chandralal Rai, Information Officer at the Division Forest Office, said that 2,168 trees were felled for the construction of the Upper Arun project and its access road.

According to Rai, Information Officer at the Division Forest Office, trees were felled over an area of approximately 21.08 hectares for the construction of the Upper Arun project and its access road - specifically in national forest land in Bhotkhola-4 and in the Paripakha Community Forest and Makpalung Community Forest areas in Bhotkhola-2.

The project has received permission to use forest land for 25 years. Along with this, work on the access road for the Upper Arun project is moving forward at a rapid pace. The Authority has begun work after signing a contract with India’s Gayatri JV and Jhapa-based Kankai Surunga JV Company for the construction of an access road of approximately 22 kilometers, including a 2.03-kilometer tunnel.

Similarly, more than 14,000 trees have so far been cut in the district for the construction of various hydropower projects. The Division Forest Office stated that 14,627 trees from 18 community forests were felled for the Arun III Hydropower Project and the Koshi Corridor transmission line. According to the Forest Office, 11 hydropower projects have used forest areas across six local levels in the district. In addition, 5,400 trees in government forest areas were cut solely for the expansion of electricity infrastructure.

[ 17 December 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries