energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Dadakhet–Raughat Transmission Line Achieves 70% Progress in Five Years

The Dadakhet–Raughat 132 kV transmission line project, which was launched to connect the electricity generated from the hydropower projects in the Myagdi and Raughat basins to the central grid, has achieved 70 percent physical progress, with five months remaining before the expiry of the contract period.

The project, run by the Nepal Electricity Authority, has taken five years to complete 70 percent of the work, while the contractor is facing a challenge to complete the remaining 30 percent within the next five months, the project said. A contract agreement was signed with Larsen & Toubro Limited on December 31, 2021, for the construction of a 25-kilometer-long transmission line from Malika Rural Municipality-7, Dadakhet, to Ambang, Raghuganga Rural Municipality-3, Rahughat, and substations at both locations for Rs 3.57 billion.

The first deadline expired on July 16, 2025, and the second deadline expired on November 16, 2026, and the third deadline has been extended to May 16, 2026. Project Chief Roshan Agarwal informed that the construction period has been extended due to the lack of orders to cut trees in the forest area, the vulnerable geography of the Rahughat substation site, disaster risk, and community disputes at some tower sites.

Out of the foundations laid for 73 towers so far, 60 towers have been erected. Work has started on all towers except for five locations where trees need to be cut. Stringing of the transmission line has been completed over a three-kilometer stretch, and the equipment for the transmission line and substations has already been imported. Progress stands at 90 percent for the Dadakhet substation, 65 percent for the transmission line, and 60 percent for the Raughat substation.

L&T Project Manager Subash Chandra Sharma has expressed the commitment to complete the project within the stipulated deadline by deploying additional workers and equipment. At Dadakhet, a 133/33 kV, 30 MVA AIS (Air-Insulated Switchgear) substation is being installed, while at Raughat, the construction of a 220/132/33 kV, 200 MVA GIS (Gas-Insulated Switchgear) substation is progressing.

The project, with an estimated total cost of NPR 4.88 billion, includes NPR 105 million from the Nepal Electricity Authority and NPR 3.82 billion as loan investment from the Asian Development Bank. Approval to use 25.62 hectares of forest area for the transmission line’s ‘right of way’ and tower construction was granted by the Cabinet meeting on February 18, 2024. It has been reported that the felling of 3,936 trees at the project site is being delayed.

Four hydropower projects with a total capacity of 172.8 MW are under construction on the Myagdi River. Some of these projects have already started supplying electricity to the 220 kV Kaligandaki transmission line through temporary towers.

Jalasarokar

[ 18 December 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries