energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Mustang Set for Improved Power Supply as Substation Construction Begins

The construction of electricity substations has begun in Chaile of Waragung Mukti Kshetra-3 and Charang of Loghekar Damodarkunda Rural Municipality-1. Under the Nepal Electricity Authority (NEA), the Nawalpur Rural Electrification and Chaile-Charang (Mustang) 33 kV Transmission Line and Substation Construction Project has moved forward with the construction of two substations in the area.

The process of constructing a 33 kV transmission line and substations in Mustang has been initiated under the leadership of Lopsang Chomphel Bista, Chairperson of Loghekar Damodarkunda Rural Municipality. On Thursday, Chairperson Bista, along with representatives of the project and the construction company, visited Chaile and Charang to conduct on-site inspections and surveys of the proposed substation sites.

According to Project Chief Bimalraj Raut, a contract worth Rs 380 million has been signed with Devyans-Visan JV, a joint venture between the Indian construction company Devyans and the Nepali construction company Visan. He said that the Nepal Electricity Authority signed the contract last year with the objective of fully electrifying Mustang district.

Although the substation construction process began a year ago, Raut explained that it took nearly 11 months to complete all contractual procedures. As per the agreement, two 33 kV substations with a capacity of 3 MVA each will be constructed in Chaile and Charang within a period of 15 months.

The substations are being constructed approximately 103 kilometers away from the Kobang substation of Thasang Rural Municipality-2, where the NEA’s central transmission line substation is located. Project Chief Raut said that the construction cost is higher than usual as the substations must be built to withstand the harsh conditions of the high Himalayan region, as they are located at an altitude of over 3,800 meters.

He added that the Detailed Project Report (DPR) has been prepared to ensure uninterrupted operation even during winter and to enable smooth functioning at high altitudes. He expressed confidence that once the substations are completed, electricity supply will be reliable and voltage-related problems will be resolved.

Chairperson Bista stated that electricity supply in the district has been problematic due to reliance on the single existing 33 kV substation in Thasang. He said the initiative to construct new substations was taken jointly by the rural municipality and concerned authorities as a long-term solution.

He further expressed confidence that the completion of the substations would ensure smooth electricity supply and contribute to the development of tourism, agriculture, and industries in the region.

Earlier, the extension of the transmission line from Kobang to Charang of Loghekar Damodarkunda-1 had been initiated under the same project. Nawaraj Kadariya, a representative of the construction company, informed that 95 percent of the physical progress of the transmission line - being implemented under a two-year contract - has been completed so far. He noted that work was delayed in some areas due to local issues.

Jalasarokar

[ 19 December 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries