energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  NEA to Issue Rs 20 Billion Energy Bonds for Major Hydropower Projects

The board of directors of the Nepal Electricity Authority has decided to issue energy bonds worth 20 billion rupees. The meeting held yesterday decided to issue the bonds only for capital expenditure as per the permission received from the Council of Ministers.

The Council of Ministers had given permission to the Nepal Electricity Authority to issue energy bonds on 9 October and had set a clear condition that the amount raised should be used for capital expenditure. As part of the implementation of the same decision, the board of directors of the authority has decided to proceed with the formal process of issuing the bonds.

According to NEA sources, out of the 20 billion rupees raised through the energy bond, 8 billion rupees will be invested in the Upper Arun Hydropower Project (1063 MW). Similarly, 5 billion rupees are planned to be spent on the Chainpur Seti Hydropower Project (210 MW), 5 billion rupees on the Tamakoshi Fifth Hydropower Project (94.8 MW), and 2 billion rupees on the Upper Modi ‘A’ (42 MW) Hydropower Project under construction. Since these projects fall under the NEA’s strategic and large-scale projects, it is said that the energy bond funds will be focused on expanding generation capacity.

The World Bank has not been able to move forward in Upper Arun due to more than 15 years of delay. Energy Minister Kulman Ghising had been saying that this project would be built with domestic investment. Similarly, the insufficient amount for Tamakoshi V, which is being built by a subsidiary of the NEA, will also be raised from the energy bond.

The annual interest rate of the energy bond will be 5.5 percent. According to the provision that permission must be obtained from the Securities and Exchange Board of Nepal for the bond issuance, a fee of 0.12 percent of the total amount to be issued will have to be paid. The Authority is preparing to proceed with the issuance process by submitting an application to the Securities and Exchange Board of Nepal soon.

The issue of energy bond issuance had been in the news before too. Although the then Managing Director of the NEA, Kulman Ghising, tried to issue energy bonds, the then Energy Minister Deepak Khadka stopped the process. After that, the issue of bond issuance remained pending for a long time. Now, with the clear permission of the Council of Ministers, the board of directors has decided again, the way for energy bond issuance has been opened.

According to energy sector experts, investing in large hydropower projects by mobilizing internal resources through energy bonds is a positive step. It is expected to strengthen the financial structure of the authority and contribute to long-term production growth and energy security.

Jalasarokar

[ 22 December 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries