energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Budhigandaki ‘A’ and ‘B’ Hydroelectric Projects: Construction Preparations Underway

Preparations have been advanced for the construction of two large hydroelectric projects based on the Budhigandaki River in Gorkha. The Budhigandaki ‘A’ Hydroelectric Project, with a capacity of 103.4 MW, and the Budhigandaki ‘B’ Hydroelectric Project, with a capacity of 226 MW, are in the final stages of preparation for construction, informed the project engineer, Durgesh Magar.

According to him, both projects are being promoted by Nayo Nepal Hydroelectric Company Pvt. Ltd. The company has planned to construct the Budhigandaki ‘A’ Project at an estimated cost of around NPR 3.132 billion and the Budhigandaki ‘B’ Project at an estimated cost of around NPR 5.699 billion.

Under the Budhigandaki ‘A’ Project, a dam will be constructed in Lusyang, Dharchhe Rural Municipality–3, and water will be channeled through a tunnel about four kilometers long to the powerhouse for electricity generation. This run-of-the-river project will generate electricity by releasing water from a 111-meter-high surface. The electricity produced here will be transmitted to the Budhigandaki ‘B’ Project through a 12.7-kilometer-long transmission line.

Similarly, the dam for the Budhigandaki ‘B’ Project will be constructed in Khanibensi, Dharchhe Rural Municipality–7. From there, water will be directed through a 9.5-kilometer-long tunnel to the planned powerhouse in Soti. This project will generate electricity by releasing water from a 197.97-meter-high surface.

According to Engineer Magar, the Environmental Impact Assessment (EIA) and the Power Purchase Agreement (PPA) for both projects have already been completed. “Based on surveys conducted before the earthquake, we are now incorporating the geological changes that occurred after the earthquake and carrying out the final survey,” he said. “Preparations are underway to begin construction from the upcoming dry season.”

The total 329.4 MW of electricity, produced by both projects and transmitted from Budhigandaki ‘A’, will be connected to the substation in Lapa, Dhading, via an 18.5-kilometer-long transmission line. These projects are expected to make a significant contribution to the national electricity system, including in Gorkha.

Jalasarokar

[ 23 December 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries