energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Sankhuwasabha Local Levels Commit to Invest in Kimathanka Arun Hydropower Project

All ten local government units of Sankhuwasabha have expressed their agreement to invest, through founder shares, in the under-construction 454-megawatt Kimathanka Arun Hydropower Project located in Bhotkhola Rural Municipality.

At a discussion program organized by the Electricity Generation Company Limited in Khandbari, representatives of the local governments clarified that they are ready to invest an amount equivalent to the shares allocated to their respective jurisdictions.

Chief Executive Officer of the project, Hiraman Waiba, said that the Kimathanka Arun project is one of the largest hydropower projects in the country. According to him, the detailed feasibility study and engineering study of the project have been completed. Waiba informed that this project will be developed based on the concept of ‘People’s Hydropower Project’.

It has been arranged that 51 percent of the investment in the project will be from the Government of Nepal and 49 percent from the general public, which, according to him, will ensure the participation and ownership of local governments and citizens.

During the discussion, Project Manager Ashok Pandit informed that the target is to start electricity generation within five years from the date construction begins. He emphasized that cooperation among all stakeholders is necessary to complete the project on time.

The Chief of the District Coordination Committee, Suman Shakya, stated that such a large and strategically important project must be completed within the stipulated timeframe, and expressed confidence that the project would be successful through coordination among the local governments, the project-promoting company, and the central government.

Under this semi-reservoir-type project, the preliminary design envisions the construction of a dam about 140 meters high on the Arun River near Chhumsur village. It is reported that after the dam is built, a reservoir covering an area of approximately 0.350 square kilometers and with a storage capacity of 10.3 million cubic meters of water will be created.

The project’s powerhouse will be located in the Pungchhi area, about 500 meters downstream from Lingam village in Bhotkhola Rural Municipality-2. For this purpose, there is a plan to construct an underground tunnel approximately 5,918 meters long with a diameter of eight meters. In addition, a 26.8-kilometer access road will be built to reach the project site.

As most of the project’s structures fall within the buffer zone of Makalu Barun National Park, it has been stated that special attention will be given to environmental management. The estimated cost of the project is approximately NPR 92 billion.

Jalasarokar

[ 23 December 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries