energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  22 MW Seti Khola begins trial production

The 22-megawatt Seti Khola Hydropower Project, located on the border of Tanahun and Kaski districts, has begun trial electricity production.

The project has begun technical testing after completing construction of civil structures, hydromechanical systems and transmission lines, according to project officials.

The run-of-river project is located along the Seti River between Punditar, Pokhara Metropolitan City-33 and Katre, Kotre, Shuklagandaki Municipality-2.

Project chief engineer Ujjwal Regmi said all physical infrastructure have been completed, allowing the project to move into the testing phase.

The construction of the project started in April 2021 by M.A. Construction Pvt. Ltd., with an estimated budget of Rs. 5.2 billion.

Under the project, a dam has been built in the Tikhalang and Musetunda areas of Pokhara Metropolitan City wards 29, 30 and 33. Water from the Seti River is diverted through a 3,200-metre underground tunnel and dropped from a height of 68 metres at the powerhouse in Punditar.

The water is used to operate two turbines, each with a capacity of 11.5 MW, generating electricity which is then connected to the national grid through a substation at Punditar and a 1.5-kilometre transmission link to the 132 kV Lekhnath–Damauli line at tower no 56.

During the testing phase, water will be released into the river from the dam and powerhouse, which may cause sudden fluctuations in river flow. Authorities have warned locals along the Seti River to take precautions. The project has urged people not to go near the river, avoid swimming, fishing, sand and gravel extraction, or grazing livestock along the riverbanks during the testing period. Parents have also been asked to keep children away from the river.

It has further cautioned the public not to approach transmission towers between Kotre and Eaklekhet, as electricity may flow through the lines during technical testing.

Officials said safety awareness is important as testing continues along both the river and transmission infrastructure.

By Amar Raj Naharki

[ 25 May 2026 / risingnepaldaily.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries