energyNP.com  
Tel
98510-91900¡¡
Email

Er.energyNP@Gmail.com

      ¡¡ energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Lead Acid Battery
¡¡LiFePO4 Battery
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Reservoir-type hydroelectric projects in government's high priority: Energy Minister

Minister for Energy, Water Resources and Irrigation, Biraj Bhakta Shrestha, has said that reservoir projects are a high priority for the government.

After the observation of the Kulekhani Hydroelectricity Project on Sunday, the Energy Minister stated that reservoir-based projects should now be promoted as a national priority for Nepal's long-term energy security, industrial development, and overall economic transformation.

Minister Shrestha asserted that the government's main focus in the coming days will be on the development of the reservoir-based projects.

He further stated that such projects would serve as a backbone not only for electricity generation but also for water management, flood control, irrigation expansion, and tourism promotion.

In discussions with employees of all three hydropower plants in Kulekhani, Minister Shrestha mentioned that the importance of structures for water storage for the future has increased, considering the rising natural risks and irregular rainfall due to climate change.

"Climate change has increased the risk of glaciers melting and altering rainfall patterns; in such a situation, there is no alternative to reservoir-based projects for energy security," he added.

Minister Shrestha emphasized the need for increased electricity production during peak hours to support the industrial sector, particularly the data centre and information technology industries.

He directed the Nepal Electricity Authority (NEA) to develop an integrated model for reservoir projects and highlighted the importance of attracting both domestic and foreign investments.

To facilitate this, the government has established a 50-year license period for such projects, aiming to encourage private sector investment. The Minister cited the Kulekhani project as a 'role model' for the country and called for immediate action to address social issues and complaints from local communities.

He noted that waste management has become a significant challenge due to rising tourist activities around the reservoir and urged collaboration with local stakeholders to protect the environment in the Indrasarovar area.

During a recent inspection of the Kulekhani project, Minister Shrestha instructed the demarcation of land within the project area, the management of debris entering the reservoir from floods, and the prompt repair and replacement of outdated equipment.

The Kulekhani project, completed in 1982, is Nepal's first reservoir-type hydroelectric project, with a total capacity of 106 MW, comprising Kulekhani-1 (60 MW), Kulekhani-2 (32 MW), and Kulekhani-3 (14 MW).

[ 25 May 2026 / risingnepaldaily.com ]¡¡¡¡¡¡
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries