energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  India’s GST Bill could increase solar costs by 9.5% - report

 

Plenty of uncertainty surrounds the potential effects of India’s forthcoming Goods and Services Tax (GST) Bill, but the cost of solar could go up by as much as INR4.5 million/MW (US$67,000), according to a new study from the Council on Energy, Environment and Water (CEEW).

Originally due to come into effect of the 1 April, but now touted by finance minister Arun Jaitley for a 1 July rollout, the GST sought to bring India under single tax rate. However, the GST Council recently decided to fix a four-tier GST tax structure.

As a result, CEEW modelled various scenarios, focusing on the threat that GST poses to the existing tax benefits for PV and the ensuing headache for both developers and investors.

It found that if current tax exemptions are removed, grid-connected solar tariffs could rise by as much as 9.5% and the rollout of the second 20GW phase of solar parks would be hampered. In this scenario, O&M, solar panel and financing costs would all increase. Furthermore, states would be affected differently. For example Rajasthan, which has a VAT and Entry Tax exemption for solar equipment, would be hit harder than other states where the exemptions are not already provided, such as in Andhra Pradesh and Gujarat.

The following table shows the possible effects on solar tariffs. Scenario 1 assumes GST rates will be calculated based on the total applicable taxes without considering any tax exemptions. Scenario II assumes GST rates will be calculated based on current subsidised tax rates:

 
Domestic manufacturers could benefit from the GST but project tariffs would go up. Credit: CEEW
 

Such a hike in costs would certainly hinder the downward trend in Indian solar tariffs, seen most recently in the ‘transformational’ record lows of around INR2.97/kWh (US$0.044) from Acme, Mahindra and Solenergi for 750MW in Madhya Pradesh. CEEW said it would set back Indian PV cost-competitiveness by 18 months.

CEEW also modelled which particular costs would be most affected by removal of tax exemptions in scenario 1:

 
Credit: CEEW
 

Even the Ministry of New and Renewable Energy (MNRE) had internal communications with officials requesting that solar benefits be exempt from the GST, but energy minister Piyush Goyal gave a strong suggestion that this would not be allowed last year. The result remains to be seen.

‘Make in India’ boost

On the flip side, CEEW found that such an environment would improve the competitiveness of Indian manufacturers of solar cells and modules, with the potential creation of another 37,000 jobs in the sector by 2022.

India’s latest budget benefitted domestic manufacturers by eliminating basic customs duty for tempered glass used in manufacturing solar cells and modules and the reduction of countervailing duty from 12.5% to 6% for parts used in the manufacture of tempered glass.

In the report, Arunabha Ghosh, chief executive, CEEW, said: “With the annual solar power capacity addition expected to be more than 12GW in 2017-18, it is vital that major hurdles for deployment, such as the potential impact of GST on the sector, be ironed out as early as possible.

“GST offers many long-term benefits, but MNRE, Solar Energy Corporation of India (SECI) and other related agencies must provide clear guidelines regarding the applicable GST slab for upcoming solar power projects and introduce government mechanisms to offset the short term negative impacts of GST.

“If current tax exemptions are curtailed, the impact of the increase in solar tariffs could be partially offset by policy instruments, such as Accelerated Depreciation benefits or Viability Gap Funding for projects incurring increased capital investments.”

 
[Feb 14, 2017 / pv-tech.org]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries