energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Adani Energy Solutions Undertakes 7GW Khavda IVA Power Transmission Project

Adani Energy Solutions has completed acquisition of Khavda Phase IV Part-A transmission project after receiving a letter of intent (LOI) from REC Power Development and Consultancy (RECPDCL).

Khavda IVA Power Transmission, a special purpose vehicle (SPV,) set up by RECPDCL for evacuating 7 GW of Renewable Energy (RE) from Khavda RE park, under Phase IV Part A package, has been acquired by AESL to execute the project. The Khavda IVA transmission line, part of National Grid, will help evacuate 7 GW of RE by connecting 765 kV double circuit lines from Khavda to Lakadia and Khavda to Bhuj (both in Gujarat) and setting up transformation capacity of 4,500 MVA.

Khavda, the world's largest renewable energy park, with a planned generation capacity of 30 GW, will immensely contribute to India's decarbonization journey. The award of this project to AESL boosts the availability of critical transmission infrastructure required for evacuation of clean energy. The Adani Group's focused approach will also ensure the transformation of Khavda from a barren stretch of land into a landmark in India's net zero journey.

AESL won the project through the Tariff-Based Competitive Bidding (TBCB) process and will commission the project in the next 24 months on BOOT (Build, Own Operate, and Transfer) basis and maintain it for the next 35 years.

The company will invest ~Rs 4,091 crore to build the ~298 km (596 ckm) transmission project. The project also includes setting up of 300 MVAr STATCOM and 3x1500 MVA, 765/400 kV Inter-connecting Transformer (ICTs) with 1x330 MVAr, 765 kV and 1x125 MVAr, 420 kV bus reactors.

by business-standard

[ 2 September, 2024 / world-energy.org ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries