energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  NEA writes to NRB to freeze accounts of defaulting industries

In the dedicated and trunk line dispute, the Nepal Electricity Authority (NEA) has made a written correspondence with Nepal Rastra Bank (NRB) to freeze the accounts of the industries which have failed to pay their dues. The NEA, which has been cutting the electricity supply lines time and again stating that 34 industries have yet to pay Rs 6.40 billion of arrears, made the correspondence with the regulatory body to halt the accounts, and share buying and selling of IPOs of those industries.

The letter sent to the NRB mentions that as the Electricity Regulatory Commission has instructed to take actions other than the disconnection of electricity supply to industries for collecting outstanding dues, the NEA has requested the central bank to freeze the accounts of the defaulting industries.

The letter mentions that “consumers who have received electricity from dedicated and trunk lines have outstanding fees to be paid to the NEA from mid-January 2016 to mid-May 2018. It is requested to assist in the collection of the revenue by freezing the bank accounts in such a way that the companies are allowed to deposit money into their accounts, but not withdraw money from their accounts, in order to facilitate the recovery of the revenue.”

The NEA has requested the Office of the Company Registrar to halt share trading and the Securities Board of Nepal to stop the sale of shares of the non-paying industries. The government had taken the decision to connect the line because cutting the industrial line would affect the production, leading to loss of employment, revenue and export.

It is said that the dispute over the electricity tariff for the dedicated and trunk lines that has been ongoing for years, has escalated due to the non-implementation of the report by the commission formed by the government under the chairmanship of former Supreme Court Justice Girish Chandra Lal to resolve the issue.

The Cabinet meeting instructed the NEA to collect dues on the basis of Time of the Day (TOD) meter according to the Lal Commission report. However, the NEA had sent the old bill. Although the industrialists have been stating that they are ready to pay the arrears based on the TOD meter, the NEA has not been able to issue the bill.

Although the NEA had disconnect electricity supply, stating that the industries have to pay Rs 6.40 billion in arrears from mid-January 2016 to mid-May 2018, the Lal Commission has said that during periods of daily load shedding of at least six hours, the NEA can only charge the designated premium rates for dedicated lines and trunk lines if the electricity service is provided for over 20 hours.

According to Section 5 (11) of the Electricity Tariff Collection Regulations 2073, there is a provision that ‘high voltage and medium voltage customers will be billed by installing a mandatory TOD meter'.

In the report, about six months from mid-July to mid-December 2015; mid-January 2016 to mid-May 2018 and mid-May 2018 to mid-July 2020 have been suggested.

The report has asked the NEA to collect unpaid tariff from mid-January 2016 to mid-May 2018. The report mentions that, considering the load-shedding notice issued by the NEA itself, the NEA can collect tariff from the relevant customer after recalculating the charges based on the specific days and duration of electricity supply through dedicated lines.

For this period, it has been asked to collect the tariff on the basis of TOD meters. The report mentions that according to the criteria set by the Electricity Tariff Fixation Commission and the NEA, power supply through dedicated lines should be maintained continuously i.e. 24 hours supply. It further states that the Authority can collect the tariffs for dedicated lines for the days when continuous electricity supply was provided.

According to the report of the commission, the industry does not have to pay the tariff from mid-July 2015 to mid-January to mid-January 2016.

NEA Managing Director Ghising held a press conference on November 12 and announced that the line will be disconnected in 15 days if the industries fail to pay their dues. Since the government and the NEA did not agree on this issue, the dispute has been escalating.

Although the industrialists were ready to pay the tariff based on the TOD meter, the NEA failed to provide the TOD meter bill. In response, On November 18, Energy Minister Deepak Khadka has formed an investigation committee to study the outstanding bills of industrialists under the chairmanship of Dr Arvind Kumar Mishra from the National College of Engineering, and former NEA employee Sri Ram Raj Pandey and Chartered Accountant Sujan Kumar Kafle.

While the committee has proceeded with the work, the NEA has used a new method to collect the arrears. After a dispute between the Authority and the government, a Cabinet meeting formed an inquiry committee under the leadership of former judge Hari kumar Pokharel to investigate the irregularities in the NEA. After Pokhrel refused to be part of the committee, the committee could not be completed.

By Dilip Paudel

[ 28 November, 2024 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries