energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Breakthrough achieved in 1700 meters long tunnel of Middle Mewa Hydropower Project

Breakthrough has been achieved in the 1700 meters long tunnel from Audit-1 to the Headworks of the 73.5 MW Middle Mewa Hydropower Project under construction in Taplejung. Sunil Regmi, senior manager of the project, said that about 75 percent of the project has been completed. According to him, the work has been advanced to complete the construction of the project by next year.

Middle Developers Limited is constructing the hydropower project. Its power plant will also be underground. Mikwakhola Rural Municipality and Meringden Rural Municipality are among the affected areas of the hydropower project. The gross head of the project will be 471.47 meters and the design discharge will be 18.67 cubic meters per second.

The headrace tunnel for the project will be about 5,314 meters. Approximately 393 meters of penstock pipes will be placed horizontally and vertically. The estimated cost of the project is about Rs 14 billion, which will remain as a semi-reservoir project.

The electricity generated from the project is planned to be integrated into the national grid through the Dhunge Sanghu substation of Nepal Electricity Authority through a 10.7 km 132 kV double circuit transmission line. For that, about 36 towers will be constructed from the power plant to the national transmission line.

The height of the tower from the ground level will be minimum 30.26 meters and maximum 39.26 meters. The annual capacity of the project is 436.09 Gigawatt hours. The project’s peak energy is 75.02 GWh and non-peak energy is 61.59 GWh.

By Khagendra Adhikari

[ 23 December, 2024 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries