energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Power produced from projects in Marsyangdi watershed area to be brought to Kathmandu

The construction of the substation and transmission line for supplying electricity generated from the projects located in the Marsyangdi watershed area to Kathmandu has been completed and brought into operation.

The construction of the 220/132 kV substation based at Markee Chowk, Aanbukhaireni Rural Municipality in Tanahun has been completed.

This substation is based on gas-insulated system (GIS) technology.

The substation built under the Marsyangdi-Kathmandu 220 kV transmission line project was charged and brought into operation on Tuesday.

Nepal Electricity Authority (NEA) has said with the charging of the substation, the 82-koilometre-long Marsyangdi-Kathmandu Transmission Line has become operational in 220 kV capacity.

NEA Managing Director Kul Man Ghising said that the infrastructure required to supply power produced from hydropower projects in Marsyangdi River corridor via the 220 kV transmission line has been readied with the operation of the substation at Markee Chowk.

He said the ‘voltage’ of the country’s integrated electricity system would be improved through this, ensuring adequate, reliable and quality power supply.

The NEA Managing Director added that electricity from the Marsyangdi corridor can be supplied towards Bharatpur also once the under-construction Markee Chowk –Bharatpur section of the Marsyangdi Corridor Transmission Line Project is completed.

Works are being carried out with the objective of completing this section of the transmission line within mid-June of 2025.

The construction of Matatirtha substation has been completed and it has come into operation since May.

Two power transformers each with the capacity of 160 MVA have been installed at both substations. Both substations are of 320 MVA capacity each.

The Marsyangdi-Kathmandu transmission line project had been initiated with the investment of the Government of Nepal and NEA, and with the grant support of the Norwegian government and the concessional loan from the Asian Development Bank.

[ 1 January, 2025 / makalukhabar.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries