energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy
 
  MPs inspect irrigation canal, pledge to take steps to raise water flow

Lawmakers Yogendra Mandal of Morang Constituency No. 5 and Dr. Shekhar Koirala of Morang Constituency No. 6 jointly carried out inspection of the Chatara Main Canal under the Sunsari-Morang Irrigation Project on Saturday.

Following the visit, both lawmakers expressed their commitment to raising farmers' issues in the parliament. The Central Vice-Chair of the Consumer Committee, Fudan Kumar Chaudhary, stated that the lawmakers assured stakeholders they would draw the attention of the concerned department, minister, and the government. Previously, Amanlal Modi, a lawmaker from Morang-4 and a former minister, had also conducted an on-site inspection.

The Consumer Committee has been urging all federal and provincial assembly members from Morang and Sunsari to ensure water supply for farmers under the Sunsari-Morang Irrigation Project, emphasising its necessity for food security.

After the construction of a new bridge in Chatara, the water flow has deviated westward, gradually reducing the amount of water supplied for irrigation in the Sunsari-Morang region through the Chatara Main Canal.

With reduced water flow, farmers in Sunsari and Morang are forced to wait their turn to irrigate their fields. Despite repeated demands by farmers to construct a permanent bed bar (a concrete dam slightly above the water surface) in the Sapta Koshi River, the concerned ministry and government have ignored their pleas, prompting stakeholders to seek help from lawmakers.

The Sunsari-Morang Irrigation Project irrigates around 68,000 hectares of land in the region. However, the current water inflow at the canal’s intake is only 10 cubic metres per second (cumecs), far below the required 45 cumecs.

According to Khangalal Sha, Secretary of the Central Coordination Committee of the Water Users' Institution, the intake currently needs at least 45 cumecs of water, but only 10 cumecs or less is available. He explained that as water levels drop, temporary stone and soil embankments are extended westward to divert water to the canal.

While this method brings some water, the embankments are washed away annually, costing the state around Rs. 3–4 million each year. In addition, millions are spent on building spurs to divert water into the intake, but they have proven ineffective, as the intake area now remains dry.

During the dry season, blocking the water flow becomes essential because temporary stone and soil embankments are easily destroyed by floods.

Tej Rijal, Senior Engineer of the Sunsari-Morang Irrigation Project, said that the intake was designed 50 years ago solely for paddy cultivation. However, increased water demand during the dry season has caused the current issues.

According to Rijal, constructing a barrage would require bilateral discussions, while building a bed bar is technically feasible but has not been implemented. He said that the increased intensity of winter crops has surged water demand, which the current system cannot fulfill. Rijal also attributed the reduced water availability to climate change.

Rijal further stated that 67 cumecs of Sapta Koshi water is diverted to the Sunkoshi-Marin Diversion during the winter, while 30–35 cumecs flow to the Kamala River. As a result, the volume of water flowing into the Chatara Main Canal is expected to decrease further.

If water levels continue to drop, the canal may eventually fail to lift any water. Therefore, Rijal emphasised the need to manage existing resources efficiently to ensure water reaches farmers’ fields.

By Hari Prasad Koirala, Urlabari

[ 27 January, 2025 / risingnepaldaily.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries