energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy
 
  37 MW Upper Myagdi Hydropower Project construction begins

Construction of the 37 MW Upper Myagdi Hydropower Project has begun in Dhaulagiri Rural Municipality-4 of Myagdi. Promoted by Hydro Empire Pvt Ltd, the project was launched by Gandaki Provincial Assembly member and former minister Resham Bahadur Jugjali for the construction of a 4-kilometer-long tunnel connecting the Simkosh Dobhan dam to Ghimleti.

The construction of the dam, tunnel and power house has been started with the target of completion by mid-April 2026. According to the project, two bailey bridges of 50 and 30 metric tons capacity have been installed over the Myagdi River and the project construction site has been connected by an access road.

Upper Myagdi, in collaboration with Upper Myagdi-1 and Myagdi Khola Hydropower Projects, has constructed an access road of about 21 kilometers from Bharwang in Malika Rural Municipality-7 to near Bagar village via Kalleni, Chhahari, Khara, Khamla and Naura.

The project, which is estimated to cost a total of Rs 6.699 billion, will have an investment of Rs 5.348 billion from Siddhartha Bank, Nepal SBI Bank, Citizens Bank, Everest Bank and Nabil Bank, in addition to the promoter and public shares.

The project, which will have 70 percent debt and 30 percent equity investment, is anticipated to generate 215.714 gigawatt-hours of electricity upon completion.

Likewise, a 132 kV capacity substation is being constructed in Malika Rural Municipality-7, Dadakhet by the Nepal Electricity Authority to connect the generated electricity to the central grid through a 132 kV single circuit transmission line 9.2 kilometers from the power plant to the Dadakhet substation.

[ 24 February, 2025 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries