energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Bridge connecting provincial capital not built even in eight years

A bridge connecting Bagmati Province's capital Hetauda with Kavrepalanchowk district has not been completed even in eight years due to delay on the part of the contractor company.

The contract was awarded to Mahadev-Sikhar-Tamakoshi-JV to build the bridge over the Bagmati River at Sikredobhan of Bagmati rural municipality-5 in Makawanpur and Khanikhola rural municipality-5 in Kavrepalanchwok.

Although a contract agreement was signed in fiscal year 2073/74 BS to complete the construction of the bridge within two years, much to the dismay of local residents, the bridge has not been built yet.

The contract agreement for the construction of the bridge was signed for over Rs 110 million excluding tax.

The local residents of Khanikhola and Mahabharat rural municipality have been facing difficulties in commuting in the absence of the bridge, said Khanchalal Jimba, Chairperson of Mahabharat rural municipality.

The construction company, however, claimed that the bridge construction has achieved 30 per cent physical progress so far. That includes erecting pillars, piling of the pillars in the middle of the river and pilling of pillars towards the Kavrepalanchowk district.

Khadga Nepal the construction company, admitted delay in constructing the bridge as they had to first build a road to transport construction materials.

He further explained that the contract was awarded to build a bridge in the place where there was no road. Thus, there was some delay while they first built the road.

Local resident Ram Prasad Timilsina mentioned, "It takes two hours on average to reach the provincial capital Hetauda from Taldhunga in Khanikhola if the bridge was built. It would facilitate the locals for the commute."

A joint team of Mahabharat rural municipality, Khanikhola rural municipality and Bagmati rural municipality last Wednesday presented an attention letter to Bagmati Province's Chief Minister Bahadur Singh Lama (Tamang) to expedite the bridge construction process.

CM Lama pledged to prioritize bridge construction and instructed the concerned minister to accelerate the construction process.

[ 6 March, 2025 / risingnepaldaily.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries