energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  270-MW semi-reservoir-based project to be developed in Bheri

A 270-megawatt semi-reservoir based hydropower project is to be developed in the Bheri River in between Nalgadh municipality in Jajarkot and Aathbiskot municipality in Rukum West.

The China Gezhouba Group Company Limited will be developing the Project and the Environment Impact Assessment Report regarding the project was discussed at the Ministry of Forests and Environment today.

During the discussions on the report at the recommendation committee determined by the Environment Protection Act- 2076 BS, Ministry joint-secretary Dhirendra Kumar Pradhan proposed to implement the project by ensuring that local bio-diversities and the livelihood of locals and indigenous peoples is affected less by the project.

Under Secretary Ramesh Basnet said the environmental study report is a scientific and legal document to be prepared for the sustainable operation of the project, just being a formal report.

Experts from various fields including bio-diversity, socio- economic and culture and pisciculture gave their views on the document.

NRAC Executive Director Dr Jyoti Prasad Gajurel said 24.75 hectares of land will be used for the project that required the removal of 152 trees if it is implemented. NRAC is the authorized body for carrying out the environmental study of the project.

According to him, a 38-metre-high dam will be constructed to store water for six hours and the project is expected to get complete in five years. Its estimated cost is Rs 46 billion. The powerhouse of the project will be based in Jyamire of Aathbisakot rural municipality in Rukum West, and a seven-kilometer tunnel will be constructed.

It has been said that to approach the project site, an 11-kilometer auxiliary route needs to be constructed from the main road. Likewise, three Bailey bridges will need to be constructed over the river.

[ 11 June, 2025 / nagariknetwork.com ]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries