energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Middle Bhotekoshi Transmission Line Undergoes Testing

- The transmission line of the 102-megawatt Middle Bhotekoshi Hydropower Project in Sindhupalchok has started testing.

- The project has planned to begin production testing within a week.

- Due to local obstructions and other issues, it has become almost certain that electricity generation will begin after 14 years.

The transmission line of the 102-megawatt Middle Bhotekoshi Hydropower Project, constructed in Sindhupalchok, began testing on Wednesday. The project, with Chilime - a subsidiary of the Nepal Electricity Authority - as the main promoter, will begin production testing within a week.

Ramgopal Shivakoti, Chief Executive Officer (CEO) of Bhotekoshi Hydropower Company, said that since the work at the Bahrabise substation has not been completed, electricity will be transmitted through a roughly 40 km transmission line to the New Khimti substation. Therefore, the electricity tested at the Khimti substation was examined on the line connected up to the Middle Bhotekoshi power house. “Now we will start production within a week,” Shivakoti said, adding, “Testing of the project’s dam, tunnel, and power house machinery has been completed. Once the transmission line is successfully tested, there will be no problem in power generation.” According to him, arrangements have been made to transmit only 220 kV of Middle Bhotekoshi’s power into the 400 kV transmission line of New Khimti.

There are plans to connect the generated electricity to the national grid through the Dhalkebar substation. It has become almost certain that electricity generation will begin nearly 14 years after the project was launched. The project, which began in 2011, had repeatedly faced interruptions in construction due to local obstructions, internal administrative problems, COVID-19, floods and landslides, earthquakes, and blockades at the Indian border. The process of contractor selection and other preparatory works had been initiated by Kulman Ghising. Later, when Ghising was forcibly transferred during Radha Gyawali’s tenure as Energy Minister, the project’s construction was halted for some time.

The project’s dam is located at Chaku in Bhotekoshi Rural Municipality, near the Chinese border, while its power house is situated at Jambu in Bahrabise Municipality. The project includes a 7.5 km tunnel. Last year, after water was sent through the tunnel, leakage occurred, which was later repaired. At present, all structures of the project have been tested. Based on a run-of-the-river design on the Bhotekoshi River, the project cost has already exceeded Rs. 20 billion. At the time of commencement, the estimated cost was Rs. 12.33 billion. Since the project could not be completed on schedule to begin electricity generation, it has been paying more than Rs. 5 million daily just in loan interest. With the rise in investment, the per-megawatt cost of electricity generation is expected to exceed Rs. 210 million. The project, which aims to generate 542.2 million units of electricity annually, is estimated to earn Rs. 2.8 billion in annual revenue.

Source: Kantipur

[ 28 August, 2025 / nepalenergyforum.com ]   
 

4th Nepal Electric, Power & Lights International Expo

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries