energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Power production begins from Upper Tadi Khola Hydro Project

The 11 MW Upper Tadi Khola Hydropower Project has begun commercial electricity production.

Suryakunda Hydroelectric Limited constructed the 11 MW Upper Tadi Khola Hydropower Project in Dupcheshwor Rural Municipality, Nuwakot district.

According to the company, the project completed the construction on July 2, 2025 and successfully completed a 15-day trial.

After the successful completion of the trial phase, commercial electricity production of the project has been started by regularly supplying electricity to the national transmission system from July 28, 2025.

Suryakunda Hydro Electric Limited is a company established with the objective of developing and operating energy projects. Api Power Company Limited has a majority stake in this company.

The project had signed a power purchase agreement with the Nepal Electricity Authority on March 16, 2012.

Similarly, the production license was obtained from the Department of Electricity Development in October 2015.

The intake of the project is at an altitude of about 1.500 metres and the powerhouse is at an altitude of 1,282 metres, according to the company.

The project has been designed to generate a total of 11 MW from two turbine units (5.5 MW each) installed in the powerhouse.

The diversion dam and auxiliary structures have been designed keeping in mind the 100-year recurrence of flood, the volume of which is estimated to be 247 cubic metres per second.

The electricity generated by the project, which is connected to the Samundratar Substation in Nuwakot district through a switchyard, has started being supplied to the national grid through a 6-kilometre long 33 kV transmission line.

This plant is expected to generate 61.319 gigawatt hours of electricity annually. Of this, 50.893 GWh is expected to be generated during the rainy season and 10.425 GWh during the dry season.

The company's initial public offering (IPO) process is in progress and is in the pipeline of the Security Board of Nepal (SEBON), according to the company.

This project is expected to contribute further to the national electricity supply, including Bagmati Province.

[ 31 August, 2025 / risingnepaldaily.com ]¡¡¡¡¡¡
 

4th Nepal Electric, Power & Lights International Expo

¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries