energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Upper Rahughat Hydropower Project Begins Test Production

Electricity from Upper Rahughat is being generated using the water released from the Chimkhola-Mangale-Rahughat powerhouse and the water from Bagarkhola in Chimkhola.

The test production of the 48.5-megawatt capacity ‘Upper’ Rahughat Hydropower Project, constructed on the Rahughat River flowing through Raghuganga Rural Municipality, has begun.

After the completion of the dam, tunnel, powerhouse, transmission line, switchyard construction, equipment installation, and internal testing, the project promoted by Tundi Power has commenced test production from today.

The project’s residential engineer, Prakash Timilsina, informed that the testing was initiated in the presence of a technical team from the Nepal Electricity Authority.

Electricity generation was started after the successful internal testing of the constructed physical structures and installed equipment,” he said, “Since no issues were observed during the testing, we are preparing to begin commercial production after 15 days.

The project’s dam is located at Chimkhola in Raghuganga Rural Municipality-7, and the powerhouse is situated at Fedhi of Ward No. 4, Dagnam. The tunnel is 4,900 meters long. A 680-meter-long penstock pipeline has been installed from the outlet to the powerhouse.

Everest Hydro is the electromechanical contractor of the Upper Rahughat Project, while Machhapuchhre Metal and Machinery is the hydromechanical contractor. The civil contractor of the project, whose construction began in 2020, is Ramechhap Sherpa Construction. The tunnel was built by South Asian Infrastructure.

The 37.5-megawatt Chimkhola-Rahughat-Mangale Hydropower Project, built by Tundi Power, had started commercial production from last Asar. Similarly, the 21.3-megawatt Thulokhola Hydropower Project, constructed by United Energy Limited, began commercial production from this Bhadra.

Electricity has been generated from Upper Rahughat using the water released from the powerhouse of the Chimkhola-Mangale-Rahughat project and the water of Bagarkhola in Chimkhola.

The estimated cost of both projects is 1.3 billion rupees. The electricity generated from these projects is temporarily connected to the national grid through the switchyard of the Rahughat Hydropower Project located in Tilkenichaur, Raghuganga Rural Municipality-3.

An 8-kilometer, 132 kV transmission line from Bandi to the Chimkhola-Rahughat-Mangale powerhouse has been constructed jointly by the Thulokhola and 22.5-megawatt Upper Thulokhola Hydropower Projects.

The 220 kV transmission line from Chimkhola to Tilkeni has been constructed by the Thulokhola, Upper Thulokhola, Chimkhola-Rahughat-Mangale, and Upper Rahughat Hydropower Projects.

[ 17 September, 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries