energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Kisantari Substation commissioned after a decad

The 33/11 kV Kisantari substation in Malika Rural Municipality-8 of Gulmi has officially begun operations. This substation, with a capacity of 3 MVA, has become operational nine years after the construction agreement was signed by the Planning and Technical Services Department of the Electricity Authority.

Built at a cost of Rs. 105 million by MSA2Jet Infrastructure Pvt. Ltd. in 2016, the substation, along with its housing, is expected to improve the electricity supply in the area. Prior to this, there was only one electricity substation in the western part of Gulmi, which served the region through four 11 kV feeders. However, due to the long distances over which electricity was supplied, voltage levels would drop at the endpoint, and if one feeder encountered an issue, power outages would affect the entire area.

Bharat Pokharel, an engineer at the Nepal Electricity Authority's Gulmi Distribution Centre, explained that the new substation was constructed to ensure a higher quality of electricity service. By organising the 33 kV transmission line, the substation will reduce transmission losses, ensuring a more reliable and consistent electricity supply. This will also enhance electrical safety, he added.

In addition to the new Kisantari substation, the district is served by substations in Ridi and Birbas to the east. The district also benefits from locally produced electricity from the 5 MW Upper Hungdi and 2.4 MW Ridi Hydropower Plant. Furthermore, electricity is transmitted to the Birbas substation from Butwal and Arghakhanchi. Engineer Pokharel noted that service is currently being provided from the 132 kV Unayachaur electricity substation.

With the commissioning of the Kisantari Substation, residents of Malika, Madane, and Dhurkot rural municipalities are expected to benefit directly from improved electricity supply. Kamala Poudel of Malika Rural Municipality-8, Marbhung, expressed her happiness at the long-awaited development, hopeful that the commissioning of the substation would lead to regular, high-quality electricity service. However, issues with the regular supply of electricity still persist in the ISMA and Musikot areas. The Electricity Authority’s Distribution Centre in Gulmi is optimistic that these problems will be resolved within next two to three months, as the construction of a 132 kV electricity substation is currently underway in Paudi Arewa.

By Toplal Aryal

[ 19 September, 2025 / risingnepaldaily.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries