energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Minister Ghising mulls scrapping contracts of Sunkoshi Marin, Bheri Babai over delays

Minister for Energy, Water Resources and Irrigation, Physical Infrastructure and Transport and Urban Development Kulman Ghising has said the government will not keep the contracts of two national pride projects - the Sunkoshi Marin and Bheri Babai Multipurpose Projects - in their current form.

Speaking at a meeting at the Energy Ministry on Tuesday with ministry officials, irrigation department heads, project chiefs, consultants and contractors, Ghising stressed that terminating the existing contracts and moving forward afresh is the only option.

The minister convened the meeting after what he described as “unnatural delays” in the construction of both projects. He noted that the setbacks have deprived the nation of crucial benefits expected from the schemes, which aim to supply irrigation water to the Tarai and boost agricultural productivity.

“One side is busy blaming the other, while contractors are only looking for loopholes. How can construction progress in such a situation? The state has already invested billions of rupees, and if we calculate the interest alone, the losses run into billions more. Where did the financial analysis done at the beginning go? What happened to the projected returns?” he warned.

Ghising said the tunnels for both projects have already been completed but the dams, powerhouses, and other major structures remain unfinished, leaving the projects stranded. “The Tarai and Madhes face a severe water shortage for irrigation. In such a situation, these projects cannot remain stuck as they are. If the contractors had been committed, the work would have been finished. Instead, there is no intention to deliver. So, extending deadlines makes no sense. Let’s cancel the contracts and move ahead,” he added.

The Bheri Babai tunnel was completed in September 2020. A contract for its dam and powerhouse construction was signed in July 2019 with China-based Guangdong Yutian–Raman JV, but the project’s overall progress has reached only 57 percent.

Similarly, construction of the Sunkoshi Marin project’s dam, powerhouse, and related structures has seen just 10 percent progress, even though nearly 60 percent of the contract period has already elapsed. The contractor for this project is Patel–Raman JV.

[ 23 September, 2025 / nagariknetwork.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries