energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Hydropower IPO issuance cannot be halted without law: FinMin Khanal

Finance Minister Rameshore Prasad Khanal has stated that while it may be appropriate to allow hydropower companies to issue an IPO only after electricity production begins, it is not possible to stop IPOs without a legal basis.

While meeting a delegation from the Independent Power Producers’ Association, Nepal (IPPAN) on Monday, Minister Khanal said that companies that have already submitted IPO applications cannot be denied permission merely because no new law has been enacted.

During the meeting, IPPAN Chairman Ganesh Karki highlighted that the Securities Board of Nepal (SEBON) has blocked hydropower IPOs for the past 28 months, causing over Rs 10 billion in economic losses to promoters and the state. He urged that the public issuance of over Rs 23 billion from 40 pipeline companies be expedited and that hydropower firms should not require a minimum net worth to obtain IPO approval.

IPPAN also demanded that the Securities Board revoke its decision to reject IPO applications until production begins, instead allowing applications when 50 percent of construction is complete and granting IPO permission at 65 percent construction. The association emphasized that due to the high investment, shares should be issued to local residents and the public even during the construction phase.

The delegation further raised concerns over the “take-and-pay” provisions included in this Fiscal Year (FY)’s budget for run-of-river projects. Despite the former Prime Minister KP Sharma Oli’s objections, the provisions have not been removed, affecting PPAs for small projects under 10 MW and creating uncertainty for 13,000 MW of pipeline projects. IPPAN requested that the government facilitate PPA approval by removing the budgetary restrictions.

Additionally, while the Electricity Act allowed import of hydropower spare parts with only 1 percent customs duty, the government has imposed 28 percent duty in the past two years. IPPAN urged Minister Khanal to enforce the provisions of the Electricity Act for spare parts and stop local governments from imposing arbitrary taxes and share demands.

Minister Khanal responded that although he had suggested allowing IPOs only after production, no law exists to implement this. “Since the Parliament is dissolved, no new law or amendment can be enacted. Therefore, all companies must receive IPO permission under the existing law,” he said.

He further questioned why the Securities Board had blocked applications for projects under construction, reiterating that IPO permissions should be granted according to current law. Minister Khanal assured that, even without new legislation, the government will work to boost the morale of energy producers by following the existing legal framework.

[ 23 September, 2025 / nagariknetwork.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries