energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Kulekhani Shutdown Underway for Automation Installation

The operation of the Kulekhani Hydroelectric Project has been shut down from Saturday to install ‘automation’ in the first and second units of the project.

The project is planning to install automation in Kulekhani Units I and II by shutting down the plant. Since electricity generation from Kulekhani is not required during the rainy season, the shutdown is being scheduled at this time to carry out maintenance and the installation of automation, said the project chief, Taradatta Bhatt.

“Since Kulekhani Units I and II, built about 43 years ago, are of an old model, we are planning to install automation in them,” he said. “After installing the automation, electricity generation and shutdown operations will be controlled by computer, whereas currently they are being done manually.”

Automation has already been installed in Kulekhani Unit III, which was constructed just four years ago.

Nepali technicians themselves are carrying out the automation installation work. For this task, technicians from Kaligandaki, Marshyangdi, and Devighat have been brought in. According to the technicians, it will take about a month to complete the installation.

While automation is being installed in Kulekhani Units I and II, Kulekhani Unit III is reported to be undergoing maintenance work. Since Units I and II are not operational, Unit III will also not operate. The water from Unit II is used to generate electricity in Unit III.

All three Kulekhani plants are currently shut down. Kulekhani, which serves as a ‘backup’ for the Nepal Electricity Authority, is usually operated during the dry season. During that time, the project is run based on electricity demand. Kulekhani Units I, II, and III were built with the purpose of using the water stored in Indrasarovar.

Kulekhani Units I, II, and III generate 60 MW, 32 MW, and 14 MW of electricity respectively, totaling 106 MW. The construction of Indrasarovar Reservoir in 1982 cost 12 million US dollars.

Source: Kantipur

[ 23 September, 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries