energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  NEA Signs PPAs for 24 Solar Projects Worth 355 MW

The Nepal Electricity Authority (NEA) has resumed signing Power Purchase Agreements (PPA), which had been stalled for months.

The authority has started PPAs specifically for solar projects that had been put on hold without any clear reason for months. As soon as Managing Director Manoj Silwal assumed office, he began making swift decisions on the pending works. He has already signed PPAs for 24 solar projects with a total capacity of 355 megawatts.

The process of sending the agreements to the Electricity Regulatory Commission for final approval has also been completed.

The Authority had already issued letters of intent for 960 megawatts last Kartik (around October/November). However, companies had been rushing for PPAs. Except for a few large ones that pleased the then government leadership, most were unable to secure PPAs. After becoming the Managing Director, Silwal approved the PPAs without any vested interest, strictly following due process and procedures.

The private sector had been complaining about the lack of PPAs.

According to the Authority, projects with a capacity of less than 10 megawatts must begin generation within 18 months of signing the Power Purchase Agreement (PPA). For projects with a capacity of more than 10 megawatts, the provision requires them to start generation within 24 months of the PPA, as stipulated in the contract.

The Authority is set to purchase electricity from solar projects located around the 220 kV, 132 kV, and 33 kV transmission lines. The 963rd meeting, chaired by then Energy Minister and Chairperson of the NEA Board of Directors, Shakti Bahadur Basnet, had decided to proceed with PPAs for the solar projects. The Authority has signed the PPAs for a period of 25 years.

For these projects, the companies will purchase land. According to a study conducted by the Ministry of Energy, the average cost of solar power was 800 million rupees per megawatt. However, with technology becoming cheaper in recent times, the average cost has dropped to around 500 million rupees per megawatt. Due to continuous technological advancements, the cost of solar power is steadily declining. A few years ago, the cost of solar in Nepal was as high as 2 billion rupees per megawatt. This figure excludes the cost of land.

For energy security, the Authority has also focused on solar power, which will help make electricity management somewhat easier for the Authority.

Source: Online Khabar

[ 28 September, 2025 / nepalenergyforum.com ]¡¡¡¡¡¡
 

Electric Folded Treadmill | Kathmandu | Nepal

¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries