energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Rs. 12.38 billion required to rebuild structures damaged by monsoon disasters

Concrete bridge over the Deumai River in Gajurmukhidham, Ilam district, severely damaged by a flash flood on October 4. File Photo: RSS

The government has estimated that around Rs. 12.38 billion will be required to rebuild road structures damaged by the recent floods and landslides triggered by heavy rains on October 4, 5, and 6 across the country.

The Ministry of Physical Infrastructure and Transport has estimated that it will cost Rs. 10.68 billion to reconstruct the main highways, alternative roads, Bailey bridges and concrete bridges destroyed during this year's monsoon disaster.

An additional Rs. 1.7 billion is needed to rebuild structures damaged by last year’s monsoon.

Minister for Energy, Water Resources and Irrigation, Physical Infrastructure and Transport and Urban Development Kul Man Ghising said that all concerned bodies under his ministries have given high priority to the operation of roads damaged and blocked by the floods and landslides in various places.

“Manpower has been mobilised, and necessary materials are being supplied to open obstructed roads as soon as possible,” Minister Ghising said, adding that regular monitoring of the works is being carried out by him and the ministry.

Floods and landslides damaged roads and bridges at over 263 locations across the country.

According to the ministry, the Mechi Highway has been the most affected by this year's monsoon disaster.

It is estimated that the reconstruction of the Mechi Highway will cost Rs. 1.5 billion.

Some of the largest damages have occurred along the Kaligandaki Corridor, the Kanti Highway and the Mechi Highway.

The Mechi Highway is damaged at nine locations and Koshi Highway at seven locations. Largest damages have occurred at Dhobidhara-Nepaltar section and Mai Khola – Rajduwali section along the Mechi Highway.

The ministry said that the reconstruction of the damaged highways, including Koshi, Mid-Hill, Postal, Araniko, Kanti, Narayanghat-Mungling will cost approximately Rs. 3.77 billion.

The Mid-Hill Highway and Khandbari-Kimanthanka section of Koshi Highway have also witnessed multiple damages.

Likewise, the Kanti Highway is washed away at three locations and structural damages have happened at four places.

Similarly, the reconstruction of 17 damaged permanent bridges is estimated to cost Rs. 4.52 billion.

The new Bailey bridges that are damaged and need to be maintained for road operation are estimated to cost around Rs. 800 million.

The reconstruction of alternative roads is estimated to cost around Rs. 1.59 billion.

In addition to road infrastructure, the recent floods have also caused severe damage to the energy sector.

32 hydropower projects affected

According to preliminary data from the Independent Power Producers’ Association, Nepal (IPPAN), about 32 hydropower projects in 10 districts across three provinces have been affected.

Of these, 17 projects in operation with a capacity of 180 MW and 15 hydropower projects with a capacity of 338 MW under construction have been affected by the floods.

The hydropower projects in Ilam district of Koshi Province, which was the most affected by the floods and landslides, have also been the most affected.

1,500 metres of embankments broken

Ministry of Energy, Water Resources and Irrigation reported that about 1,500 metres of embankments have been eroded due to river flooding and landslides, causing an estimated loss of Rs. 100 million.

Kankai River alone eroded about 200 metres of embankment on the lower right bank of the Postal Highway in Gauriganj Rural Municipality-2, Jhapa.

In addition, an estimated 200 metres of embankment has been eroded in Kuwadi of Jhapa Rural Municipality-2, damaging about 25 hectares of land. It is estimated that the damage is Rs. 7.5 million.

Similarly, the Mechi River has caused damage worth about Rs. 5 million by breaking the embankments in various places.

It is reported that the Ratu River in Mahottari has eroded about 890 metres of embankments in various places.

The ministry has said that the damage in Mahottari is estimated to be worth Rs. 80 million.

Meanwhile, Ministry of Agriculture and Livestock Development has begun collecting details of loss and damage in the agriculture and livestock sector across the country due to the recent heavy rainfall.

The ministry has instructed its subordinate offices to collect preliminary details of loss from all seven provinces and submit them to the ministry.

By Laxman Kafle

[ 9 October, 2025 / risingnepaldaily.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries