energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  IPPAN demands relief for flood-hit hydro projects

Minister for Energy, Water Resources and Irrigation Kul Man Ghising, IPPAN President Ganesh Karki and members during a meeting in Kathmandu, Thursday. Photo: TRN

The Independent Power Producers' Association, Nepal (IPPAN), has called on the government to immediately introduce relief package to support the reconstruction of hydropower projects severely impacted by recent floods.

Meeting with Minister for Energy, Water Resources and Irrigation Minister Kul Man Ghising on Wednesday, IPPAN President Ganesh Karki said that the government should announce a relief package for the reconstruction of flood-damaged hydropower projects.

Karki said that a relief package should be brought by the government considering all the projects damaged by the recent floods on October 4 and 5 and previous year's floods as well.

The IPPAN proposed that the package should address various key issues, including the extension of Required Commercial Operation Date (RCOD) and license periods, loan rescheduling, long-term financing, and customs duty waivers on essential equipment.

It demanded that the government make arrangements for the import of machinery and equipment required for the reconstruction and maintenance of flood-affected projects at 1 per cent customs duty and extend the RCOD period for under-construction projects damaged by the flood by three years and the license period by five years.

The IPPAN has demanded that the system that automatically converts to a Take and Pay PPA if electricity is not produced within the fiscal year 2025/26 to 2027/28 be abolished.

President Karki said multiple rounds of flooding since June 2023 had caused severe damage to both operating and under-construction hydropower projects, requiring urgent policy intervention.

During the meeting, Minister Ghising said that he would take initiative to provide all possible relief to the flood-affected projects. He also informed that he would present the issues related to forest-related energy projects in the upcoming cabinet meeting to resolve them.

Due to floods and landslides caused by heavy rains on October 3-5, 20 hydropower projects in operation have been affected, of which 17 hydropower projects with a capacity of 135 MW have been completely shut down. Three projects with a capacity of 156 MW have been partially affected.

Similarly, 17 under construction hydropower projects with a capacity of 520 MW have been affected by the floods.

[ 10 October, 2025 / risingnepaldaily.com ]¡¡¡¡¡¡
 

Electric Folded Treadmill | Kathmandu | Nepal

¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries