energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Tunnel completed, dam delayed: Sunkoshi–Marin project struggles to stay on track

This monsoon once again reminded farmers in the Terai of the cost of waiting. As rains arrived late, paddy planting was delayed - and thousands of farmers, who rely on timely irrigation, watched their fields dry.

For years, the government has promised to end this recurring hardship through the Sunkoshi–Marin Diversion Project (SMDP), a multipurpose scheme designed to channel Himalayan river water to the nation’s food bowl. The project pledges a lifeline: irrigation for over 125,000 hectares of farmland across six Terai districts.

The tunnel - the engineering centerpiece of the project - is already complete. But the dam that will feed water into it is moving at a crawl, raising doubts about whether the long-awaited promise will arrive in time for farmers who have waited too long already.

Tunnel ahead of time, dam far behind

A 13.3-kilometer tunnel from Sunkoshi to the Marin River was completed this April - ahead of schedule - using a Tunnel Boring Machine, the same technology used in the Bheri-Babai Diversion Project. It will eventually divert 67 cubic meters of water per second to the Terai.

Yet the Sunkoshi dam - the key to channeling water into that tunnel - is nowhere near the pace required.

Project Chief Ganesh Marasini said dam work should already have crossed 60 percent, but only about 10 percent has been completed. “Only 10–11% of the dam work has been completed,” he said. “This delay is directly affecting the overall project timeline.”

The dam, planned at Kanadhungri in Sunkoshi Rural Municipality-7, will stand about 30 meters high and 158 meters long. From there, water will flow into the tunnel and eventually irrigate farmland in Bara, Parsa, Rautahat, Sarlahi, Mahottari, and Dhanusha districts.

Contractor under scrutiny

Patel–Raman JV was awarded the contract worth Rs 14.759 billion, but only Raman Construction is currently active onsite. With construction lagging far behind expectations, the government is now considering terminating the contract.

“Progress is far below target,” Marasini said. “We are monitoring the company’s work for another two to three months before deciding whether to continue or cancel the contract.”

Floods last year and heavy rainfall this year further hampered work, said Raman Construction chief Raman Mahato, who added that mobilization challenges and flood damage slowed progress.

The overall project - estimated at Rs 50 billion - was expected to be completed within four years and seven months. The dam contract was signed in 2079 BS with a deadline of 2084 BS. Now, with only 22 months left, officials fear time is slipping away.

Energy and irrigation promise

Beyond irrigation, the project also plans to generate 31.7 MW of electricity by using the diverted water’s 66.29-meter head. Power generation structures and grid connection - via Sarlahi’s Nawalpur - are part of later phases.

But until the dam rises, neither irrigation nor hydropower can begin. Farmers, meanwhile, continue to depend on the weather instead of reliable irrigation - hoping the national dream of water security does not turn into yet another delayed promise.

By Dilip Paudel

[ 30 October, 2025 / nagariknetwork.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries