energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Ridge Line Energy IPO Application Deadline Today

January 12, 2025 is the final day to apply for the Initial Public Offering (IPO) issued by Ridge Line Energy Limited for local residents of the project-affected area. The company has been issuing the IPO to local residents since December 28, 2024.

The company had received approval to issue shares worth 22 percent of its issued capital of NPR 1.185 billion, amounting to NPR 260.7 million, equivalent to 2.607 million shares. Out of this, 1.185 million ordinary shares worth NPR 118.5 million, with a face value of NPR 100 per share, have been issued for local residents of the project-affected area.

Eligible to apply for the said IPO are local residents from all wards of Ajirkot Rural Municipality in Gorkha District, as well as residents of Wards No. 1, 2, and 3 of Dudhpokhari Rural Municipality in Lamjung District, and Wards No. 4, 5, and 6 of Dordi Rural Municipality.

For the IPO, applications can be submitted for a minimum of 10 shares and a maximum of 50,000 shares.

In the rating conducted for the IPO issuance, CARE Ratings Nepal has assigned the company a “CARE-NP BB (Care-NP Double B) Issuer Rating.” This indicates a moderate level of risk in the company’s ability to meet its financial obligations.

The total cost of the 9.05 MW Super Chepe Hydropower Project operated by the company stands at NPR 2.096 billion. According to the company, the cost per megawatt is NPR 231.6 million. The project’s electricity generation license has a remaining validity of 30 years and 11 months. The project’s simple payback period is 7 years and 4 months, while the discounted payback period is 10 years and 9 months.

The company has been generating electricity commercially from the Super Chepe Hydropower Project since January 22, 2024 and has been selling power through the national transmission line.

Prabhu Capital Limited has been appointed as the share issue and sales manager of the company. Local residents can submit their applications from the Ridge Line Energy project office in Gorkha, Prabhu Capital Limited at Kamaladi, and the Chhepetar and Palungtar branch offices of Prabhu Bank. In addition, applications can also be submitted through the online system operated by Prabhu Capital at https://ipoapply.prabhucapital.com

Residents of the project-affected area are required to pay a fee of NPR 2 for the share purchase application form.

Jalasarokar

[ 12 January 2026 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries